Laserfiche WebLink
� > <br /> CITY OF ORONO SEPTIC SYSTENI PER�rIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, Mn 5�323 <br /> JOB SITE ADDRESS �l�-�� C�, r�►'��.� �� , <br /> Occupancy Type: Residential �� Commercial Other <br /> Permit Type: New or Replacement System $100.00 ✓ <br /> Repair Existing System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's lti'ame: J ���^ 1�'� C,�g '� Phone Number: <br /> Nlailing Address: City: Zip: <br /> Contractor'sName: [ c���-2_.S r} S�r,�S PhoneNumber: �7y—/762 (J"S_'SSS� <br /> Nlailing Address: � '} ��7�st- S � � City:I�L,�J,z,� Zip: S���3 <br /> *** DO NOT 1�'IAIL PAYI�TENT"'ITH THIS APPLICATION*** <br /> GENERAL 1NSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> A�ency(MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system desi�n. Desi�n reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> roujh up but prior to sand placement (sand will be jar tested for silt content), and again <br /> durin� pressure distribution pipinj installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holdin�i�IPCAInstallers License shall be present durin�all inspections. A 24-hour <br /> notice is required for all inspections. <br />