Laserfiche WebLink
i� <br /> � . , <br /> DETERMINING PERMIT FEES <br /> ❑ SAC Charge(2013 Rate=$2,435.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connectiou permit will not be issued) <br /> �� } <br /> �Sewer Connection/Disconnect/Repair($50.00/Per Stub) $ �;� � ��� <br /> Pipe size inches;material Schd 40 air tested; cast iron <br /> �Water Connection/Disconnect/Repair($50.00/Per Stub) $ �4i (�' � <br /> Pipe size inches;material Schd 40 air tested; copper <br /> Water Availability For Future Hook-Up to Water($50.00) $ ' <br /> Water Availabilitv Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> I � � <br /> 1. SUBTOTAL of Permit Requested: $ � � � ' � D <br /> 2. STATE SURCHARGE $ 5.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ '��. � � <br /> ADDITIONAL INFORMATION—WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a s�arate permit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the ity of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance wit the rdinances of the City and the regulations of the State of <br /> Minnesota and certitl that all s tem ts made on this application are, true and correct. <br /> �- - 3 <br /> Applicant: Date: I� � <br />