My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01246 (retaining wall)
Orono
>
Property Files
>
Street Address
>
C
>
Caroline Avenue
>
2690 Caroline Avenue - 20-117-23-24-0033
>
Permits/Inspections
>
2014-01246 (retaining wall)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:54:58 PM
Creation date
2/16/2016 10:44:27 AM
Metadata
Fields
Template:
x Address Old
House Number
2690
Street Name
Caroline
Street Type
Avenue
Address
2690 Caroline Avenue
Document Type
Permits/Inspections
PIN
2011723240033
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Melanie Curtis <br /> From: Robert Bean [bobbe@bolton-menk.com] <br /> Sent: Sunday, November 09, 2014 4:00 PM <br /> To: Melanie Curtis <br /> Subject: 2014-01246 -2690 Caroline Avenue <br /> Melanie, <br /> I have completed review of the Building Permit application package for 2690 Caroline Avenue. Following are my <br /> comments for City consideration: <br /> 1. The perimeter silt fence should be inspected by the City prior to final permit approval to ensure it is still in place <br /> and functioning properly. <br /> 2. Ditch checks should be installed as indicated on the plan immediately after grading and wall construction are <br /> completed, and the disturbed areas should be immediately stabilized with seed or sod as necessary. <br /> 3. A financial security of$2,500 from the Applicant is recommended for erosion control and engineering oversight. <br /> The financial security is intended to provide protection in the event that it becomes necessary for the City to <br /> install or maintain erosion and sediment control within the project area and covers the cost of vegetation re- <br /> establishment if the applicant is unable to follow through with the conditions of approval. <br /> 4. The applicant may be required to obtain Minnehaha Creek Watershed District (MCWD) approval and permitting <br /> for their Erosion Control rule. A copy of any approved permit or confirmation that no permit is required should <br /> be submitted prior to any land altering activities. <br /> If you have any questions or comments, please contact me to discuss. <br /> Thanks, <br /> Robert E. Bean,Jr, P.E. <br /> LEED Green Assoc. <br /> Water Resources Engineer <br /> Bolton & Menk, Inc. <br /> Consulting Engineers&Surveyors <br /> 2638 Shadow Lane, Suite 200 <br /> Chaska, MN 55318 <br /> P:(952)448-8838, ext 2892 <br /> F:(952)448-8805 <br /> email: bobbe@bolton-menk.com <br /> www.bolton-menk.com <br /> This email has been scanned by the Symantec Email Security.cloud service. <br /> For more information please visit http://www.symanteccloud.com <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.