My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01488 (new structure)
Orono
>
Property Files
>
Street Address
>
C
>
Carman Street
>
2490 Carman Street - 20-117-23-12-0065
>
Permits/Inspections
>
2014-01488 (new structure)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:50:14 PM
Creation date
2/12/2016 4:23:56 PM
Metadata
Fields
Template:
x Address Old
House Number
2490
Street Name
Carman
Street Type
Street
Address
2490 Carman Street
Document Type
Permits/Inspections
PIN
2011723120065
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Friday, January 16, 2015 2:34 PM <br /> To: Christine Mattson <br /> Cc: Melanie Curtis <br /> Subject: 2014-01488 2490 Carman St <br /> I've completed a grading review of the proposed plans for the permit/property listed in the subject line and provide the <br /> following comments: <br /> 1.All comments are based on the assumption that the driveway easement for 2470 across 2490 Carman way has been <br /> granted. <br /> 2.The drainage swale on the east side of the property as shown is adequate, however the neighboring property's <br /> grading plan shows a similar swale that is shared by both properties. The shared swale is preferred if agreed to by both <br /> property owners. An agreement should be entered into by both property owners prior to the commencement of any <br /> grading operations. <br /> 3.The silt fence as shown should be sufficient, however will need to be coordinated with the neighboring property to <br /> the east if construction occurs concurrently. <br /> 4. The silt fence shall be installed and inspected by the City prior to any land disturbing activities. The Contractor must <br /> provide a minimum 24 hour notice prior to inspection. <br /> 5.A separate utility permit will be required for the sewer connection/reconnection. <br /> Adam <br /> Adam T. Edwards, P.E. <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661 <br /> aedwards@ci.orono.mn.us <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.