Laserfiche WebLink
DETERMINING PERMIT FEES <br /> ❑ SAC Charge(2015 Rate=�2,485.00) $ <br /> (SAC Charge must accompany all sewer pernut applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> ❑ Sewer Connection/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; cast iron <br /> Water Connection/Disconnect/Repair($50.00/Per Stub) $ �O� v — <br /> Pipe size inches;material Schd 40 air tested; copper <br /> ❑Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availabilitv Explanafion: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Pubiic Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> l. Issue Water Meter&Horn Pernut <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Pernut <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ 1.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ ��� U v <br /> ADDITIONAL INFORMATION—WATER METERS <br /> ❑ WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> ❑ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and cert fies that all statements made o is application are,true and conect. <br /> / /✓ <br /> - ,..;' " � , <br /> Applicant: Date: '�J �CP ���` <br />