Laserfiche WebLink
, <br /> REScheck Inspection Checklist <br /> 2000 IECC <br /> Generated by REScheck-Web Software <br /> DATE: t2/10/03 <br /> PROJECT TITLE: Serna <br /> Bldg. � <br /> Dept. � <br /> Use � <br /> � <br /> � Ceilings: <br /> [ ] � l. Ceiling l:Cathedral,R-44.0 cavity insulation <br /> � Comments: �`'x 1 " �,,}�,�r5 <br /> I <br /> � Above-Grade Walls: <br /> [ ] � l. Wall i: Wood Frame, 16"o.c.,R-19.0 cavity insulation <br /> � Comments: a` x b' J�v�s <br /> � <br /> � Basement Walls: <br /> [ ] � l. Basement Wall I: Solid Concrete or Masonry,9.0'hU8.0'bg/9.0' insul, <br /> � R-11.0 cavity insulation � <br /> � Comments: �j, �,�*e r�ll¢,c� Bl�c.l� w` a "y I,..���i�r V11a1� /��bv+q <br /> I �,�t�.�,;,� Blo�k W411 <br /> � Windows: <br /> [ ] � 1. Window 1: Wood Frame, Double Pane, U-factor:0.360 <br /> � For windows without labeled U-factors,describe features: <br /> � #Panes Frame Type Thermal Break?[ ] Yes[ ]No <br /> � Comments: <br /> � <br /> � Doors: <br /> [ ] � 1. Door l: Solid,U-factor:0.410 <br /> � Comments: <br /> � <br /> � Heating and Cooling Equipment: <br /> [ ] � 1. Furnace 1: Forced Hot Air(Non-Electric),90 AFUE or higher <br /> � Make and Model Number <br /> [ ] � 2• Air Conditioner 1:Electric Central Air, 10 SEER or higher <br /> � Make and Model Number <br /> � <br /> � Air Leakage: <br /> [ ] � Joints,penetrations,and all other such openings in the building envelope that are sources of air <br /> � leakage must be sealed. <br /> [ ] � Recessed lights must be 1)Type IC rated,or 2)installerl inside an appropriate air-tight assembly <br /> � with a 0.5"ctearance from combustible materials.If non-IC rated,the fixture must be installed with a <br /> � 3"clearance from insulation. <br /> � <br /> � Vapor Retarder: <br /> [ ] � Required on the warm-in-winter side of all non-vented framed ceilings,walls,and floors. <br /> � <br /> j Materials Identification: <br /> [ ] � Materials and equipment must be installed in accordance with the manufacturer's installation instructions. <br /> [ ] � Materials and equipment must be identified so that compliance can be determined. <br /> [ ] � Manufacturer manuals for al( installed heating and cooling equipment and service water heating <br /> � <br /> .....�«�..».. <br /> 'i0i i <br /> P.O.Boz 5D2-Wayzeta�MN-55�t <br /> Toll-hee 1-888-533-5539 <br /> Facsknile i-877-533-5539 <br /> www.leekleys.com <br />