Laserfiche WebLink
Date Application Received: 10/21/15 <br />Date Application Considered as Complete: 10/30/15 <br />120-Day Review Period Expires: 02/27/16 <br />REQUEST FOR COUNCIL ACTION <br />Date: 21 January 2016 <br /> Item No.: 11 <br />Department Approval: Administrator Approval: Agenda Section: <br />Name: Melanie Curtis mcc JML Planning <br />Title: Planner <br />Item Description: <br />#15-3795, Southview Design o/b/o Robert & Beth Schnell, 1130 Old Crystal Bay Rd S , Variances <br /> <br />Application Summary: <br />The original request for average lakeshore setback, lake setback, wetland setback, and 75-foot hardcover <br />variances was first reviewed by the Planning Commission in November where it was tabled to allow the <br />applicant to make some changes/reductions. In response to the feedback given, the applicant modified the <br />proposal and in turn the requested variances have changed slightly. <br /> <br />The applicant submitted a revised plan which results in a pool patio design following the contour of the 75- <br />foot setback line. A portion of the proposed stair and wall which access grade on the lake side as well as a <br />stepper walkway are still proposed within the 75-foot area. A corner of the pool encroaches as close as 6 feet <br />to the bottom stair and pergola overhang of the adjacent dining deck; a variance would be needed to allow <br />this configuration. (Note: the January 12th staff memo to the Planning Commission incorrectly reported the <br />separation between the pool and the deck and pergola as 4-feet. The actual separation is 6 feet although it <br />still requires a variance.) <br /> <br />The revised plan results in the need for the following variances: <br />1. An average lakeshore setback variance; <br />2. A lake setback variance to allow structure within the 150-foot setback of French Lake; <br />3. A 75-foot zone hardcover variance to permit stepping stones as shown; and <br />4. A structure-to-structure setback variance to allow the pool to encroach as close as 6 feet to the <br />pergola and dining deck. <br /> <br />Planning Commission Recommendation <br />On January 19, 2016, the Planning Commission continued the November public hearing and reviewed the <br />revised plans. The Commission voted 5 in favor and 1 against on a motion to approve the revised plan as <br />submitted. The dissenting commissioner was opposed to the allowance of stepping stones within the 75-foot <br />zone to connect the stairs. <br /> <br />Planning Staff Recommendation <br />Staff recommends the approval of the variances with the exception of the allowance of the stepping stone <br />pavers within the 75-foot setback. The applicant should be required to provide an updated survey and <br />hardcover calculations which reflect the approved plan prior to adoption of a resolution on this application. <br /> <br />COUNCIL ACTION REQUESTED <br />Council should consider directing staff to draft a resolution reflecting your decision. <br /> <br />List of Exhibits: <br />Exhibit A. Proposed Plans & Elevations <br />Exhibit B. Proposed Survey (reflects previously proposed pool layout) <br />Exhibit C. PC Staff Report & Exhibits <br />Exhibit D. Draft PC Minutes