Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, January 11, 2016 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 8 of 24 <br /> <br />11. #16-3804 LAKEWEST, LLC/CURT FRETHEIM, 3245 WAYZATA BOULEVARD – <br />SKETCH PLAN REVIEW (continued) <br /> <br />As to the site density, the property is guided for multi-family residential use in the Orono Community <br />Management Plan at a density of 10-15 units per buildable acre. <br /> <br />There is an estimated non-landfill buildable acreage of five acres. The applicants’ proposal does not meet <br />that level of density at roughly five units an acre and would require an amendment to the CMP parameters <br />for his site. Staff has a meeting with the Metropolitan Council later in January to discuss the <br />ramifications of developing properties at lower densities. Gaffron noted the City Council was fairly <br />receptive to the proposed density a year ago. <br />Gaffron indicated he has provided a variety of review considerations in Staff’s report. The Council <br />should discuss the following: <br /> <br />1. The departure from the specific development parameters established for this site in the current <br /> Comprehensive Plan talks about two single buildings that are actually multi-family, with as many <br /> as two dozen units per building. That concept is different than what the applicant is proposing. <br /> At the time the 2008-2030 Comprehensive Plan was created, it was suggested that this is not a <br /> likely location for single-family homes with a 2-acre minimum lot size since it is located between <br /> a freeway and a highway and is also a site that has been used partially for landfill use in the past. <br /> <br />2. The general design and orientation of the dwelling units is slightly different than what was <br /> proposed last time. The minimal lot sizes and setbacks as compared to the RPUD standards <br /> would indicate the need for development flexibility and would allow the City to vary from the lot <br /> sizes without the need to grant variances. <br /> <br />3. In discussing the Phase II multi-family concept for the landfill area, the Council should consider <br /> whether there are other desired or to-be-explored for this site. <br /> <br />4. The issue of future implications of developing at densities lower than those guided for in the <br /> Comprehensive Plan will be reviewed with Freya Thamman later this month and Staff will <br /> apprise the Council of the results of that discussion. <br /> <br />The Council should discuss the sketch plan and provide direction to the applicant. <br /> <br />Ben Wikstrom, Lakewest Development, indicated he met with Staff a few weeks ago. The plan being <br />presented this evening is similar to the plan that was presented in 2014, with a few minor tweaks and <br />changes. Wikstrom stated the reason they did not come back right away was so they could implement the <br />suggestions the Council made last time and conduct soil borings. Wikstrom stated they have also been <br />working with the EPA on whether the entire site could be developed and discussing whether the utilities <br />could be extended with City Staff. <br /> <br />Wikstrom stated they have closed on the property and are ready to proceed forward with development of <br />the site. The Phase 1 portion consists of 27 units, single-family. Phase 2 is the remainder of the site. <br />Wikstrom noted the City’s Comprehensive Plan did not identify that portion of the site for any specific <br />use and that they have attempted to come up with a building that would meet the parameters that were <br />shown in the Comprehensive Plan as far as footprint size, density, and height.