Laserfiche WebLink
�G <br /> s <br /> d7 <br /> O- <br /> ��� G. PROPOSED PLANS <br /> Two (2) scaled and one (1) 8 '/2" x 11" or 11" x 17" for reproduction of proposed plans showing floor plans <br /> and elevation views. For "rebuild" or "remodel" projects, the applicant should provide an additional <br /> elevation plan illustrating the proposed addition/new home envelope overtapping the existing. <br /> Additionally, all setbacks should be shown three-dimensionally on the elevation drawings. <br /> TALK TO PLANNING STAFF FOR ADDITIONAL INFORMATION. <br /> H. HARDCOVER INFORMATION AND HARDCOVER CALCULATION WORKSHEET (see pages 19-21) <br /> Hardcover calculations are required for properties within 1000' of the lakes or 300' of creeks, which are <br /> listed in Survey Requirements #14 on page 6. 1.,��J �1 � d o �i���r c�►'� (��,-�fe� <br /> � SEPTIC SYSTEMS CA�«=���U�S i� �W �� ACG1� �. 51�2� <br /> S U W C'_ C��rt!� �cNt-��r►�l �r.v� Y1 vw� �,S <br /> Septic system site evaluation report for proposed new residences within unsewered, rural areas. <br /> New On-site Installation or Addition Required <br /> • For all new construction outside districts served by municipal sewer. <br /> • Anytime the existing is classified non-conforming or when the addition of bedrooms, installation of <br /> mechanical or plumbing equipment, or other factors are likely to affect the system. <br /> Procedure for On-site Installation or Repair <br /> • A State Licensed Designer(1 or 2) must perform soil testing and the system design. <br /> • Distribute report to contractors for bidding. <br /> • A list of state licensed contractors can be found at www.pca.state.mn.us/proqrams/ists/ists.xls. <br /> General Information <br /> When planning new home construction or additions to an existing home, both primary and future drain <br /> field sites must be preserved for the long term use of the property. All setbacks and property lines must <br /> be verified prior to the issuance of a septic system permit. <br /> Once drain field sites have been verified, snow fencing must be placed surrounding sites to prevent them <br /> from damage. Vehicular traffic; such as cars, trucks, earth moving equipment, etc. could compact drain <br /> field sites, rendering them unusable, prohibiting the timely completion of the project and or limit the long <br /> term use of the property. Snow fencing must be in place prior to the issuance of a building permit. <br /> WETLAND DELINEATION, WETLAND BUFFER EVALUATION AND BUFFER IMPROVEMENT PLAN <br /> (see page 23) <br /> A wetland delineation is required if there is a wetland on or close to the property. <br /> *'�"*"`A VARIANCE !S NOT A BUILDING PERMIT"'"`'`* <br /> If your variance is approved, you have one year in which to apply for a building permit. See the <br /> inspector for any additionat information which may be required at that time. Note that the permit can <br /> be issued only within the limits of approval: do not relocate or enlarge a building after approval or a <br /> new variance may be required. <br /> - 7 - <br /> � <br />