Laserfiche WebLink
� L�� ►�"a w I1 �nct c� �c��..;:�-a-� <br /> 2591.1 <br /> To: John R. Gerhardson, Public Works Director <br /> Frvm: Lyle Oman, Building Official <br /> Date: February 5, 1991 <br /> Subject: Repair of Lumber Yard Building <br /> On February l, 1991 an inspection was conducted on the <br /> lumber yard building to determine what would be required to <br /> repair the leaking roof. It is my opinion that the building is <br /> beyond repair and if someone was to request a permit to repair a <br /> building in this condition on private property, I would deny the <br /> permit and commence hazardous building action. Structural <br /> deficiencies and deterioration starts at the roof and continues <br /> down to the foundation. <br /> - Roofing is leaking and is past its life expectancy. <br /> - Roof sheathing is rotted. <br /> - Rafters are overspan and rotted. <br /> - Beams are overspan and rotted and many are spliced <br /> together at mid-span instead of being a solid member between <br /> bearing points. <br /> - Posts are rotted, undersized and are no longer plumb. <br /> - Foundation is crumbling and bearing points are unstable. <br /> - The whole building is leaning toward Brown Road. <br /> It is my recommendation that all equipment and materials <br /> should be removed as soon as possible and the building be secured <br /> until it can be removed. <br />