Laserfiche WebLink
I � \\ <br /> / � \�\ <br /> � � O t'\1 <br /> � ,,, .;� _ ._ i I ����' O� a���� <br /> �, 'a � �� ,I ` - �/� Municipal Offices <br /> � �� � '.,,`� , �., <br /> '� ��:;`�� ' i.�:�-� ���� Street Address: Mailing Address: <br /> \`��t�9 + `� ���� 2750 Kelley Parkway P.O. Box 66 <br /> \\���/ Orono, MN 55356 Crystal Bay, MN 55323-D066 <br /> To: The Cunent Owner of Address �r 3 0 ��Uc�.T�v� S <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the know�n components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> leQal action. <br /> System Ident' as Non-Compliant <br /> Yes <br /> Nn <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s mp out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �-'3l- �C� . The tank(s) should be cleaned through the manhole and <br /> not throu�h the inspection pipes, tlus allows for proper cleanin�. <br /> Comments: <br /> w <br /> Inspector <br /> : ��'��' � Date of Inspection ��O� • <br /> Telephone(952)249-4600 • Fa�(952)249-4616 <br /> www�.ci.orono.mn.us <br />