My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P08874 - repair septic system
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
825 Brown Road South - PID: 10-117-23-21-0008
>
Permits/Inspections
>
2005-P08874 - repair septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:20:34 PM
Creation date
2/5/2016 2:18:59 PM
Metadata
Fields
Template:
x Address Old
House Number
825
Street Name
Brown
Street Type
Road
Street Direction
South
Address
825 Brown Road South
Document Type
Permits/Inspections
PIN
1011723210008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO SEPTIC SYSTEM PER1VI�r APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> JOB SITE ADDRESS � 2"� �Yo w''1 ��—C� � S . <br /> Occupancy Type: Residential � Commercial Other <br /> Permit Type: New or Replacement System $100.00 <br /> Repair Existing System $ 50.00 ✓- <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's Name: ��f���5�� Phone Number: <br /> Mailing Address: �Z� 6�-o�vr �� ` 5 _ City:v��> Zip: <br /> Contractor's Name:I-���es �f 5a-r-S ��cc-. Phone Number: �7�3 �7� -/7.6 Z- <br /> Mailing Address: 2�3 ssz`� sr-s � City:�'�2P,��,.�,� Zip: �-;�cG� <br /> *** DO NOT MAIL PAYMENT WITH THIS APPLICATION*** <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> Agency(MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement(sand will be jar tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding NIPCA Installers License shall be present during all inspections. A 24-hour <br /> notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.