Laserfiche WebLink
DETERMINING PERMIT FEES <br /> rL ob <br /> SAC Charge(2005 Rate=$1,450.00) $ � 7 � <br /> (SAC Charge must accompany all sewer pernut applications unless prepaid) <br /> (Orono City Staff can deternune if applicable) <br /> (If not prepaid, a sewer connection permit will not be issued) <br /> aU � <br /> �Sewer Connection/Disconnect/Repair($35.00/Per Stub) $ 3� <br /> Pipe size inches; material Schd 40 air tested; cast iron <br /> ❑ Water Connection/Disconnect/Repair(�35.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ .50 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50 � <br /> 4. TOTAL PERMIT FEE (Add Lines 1-3 Above) $ <br /> ADDITIONAL INFORMATION—WATER METERS <br /> • WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate pernut. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono far issuance of a Utility Permit, agrees to do <br /> all wark in strict accordance with the ordinances of the City and the regulations of the State of � <br /> Minnesota, and certifies that all statements made on this application are, true and correct. <br /> Applicant: Date: <br />