Laserfiche WebLink
.;s -. <br /> OSTP Non-Level Pressure Distribution - <br /> UNIVERSITY -�.�: <br /> Minnesota Pollution Design Worksheet OF MINNESOTA � }� <br /> Control A enc t-`!\`'- <br /> Lateral 3 GPM=Length of Lateral X Gallons Per Minute Per Foot(Line 8) <br /> �� ft X 0.30 GPM/Ft= O.O GPM <br /> Number of Perforations=GPM/Ftow Rate for Lateral 2(Line b.3) Check Table to ensure the maximum number of perforations is not <br /> exceeded. <br /> 0.0 .- Q = #VALUE! Perforations Select Type of Manifold Connection(End or Center): <br /> Spacing=(Length of Lateral)/(Number of Perforations-1) ❑ E"d ❑ ce"ter <br /> (� ) _ ( #### Perforations-1) _ ####ft <br /> Lateral 4 GPM=Length of Lateral X Gallons Per Minute Per Foot(Line 8) <br /> � ft X 0.30 GPM/Ft= O.O GPM <br /> Number of Perforations=GPM/Flow Rate for Lateral 2(Line 6.4) Check Table to ensure the maximum number of perforations is not <br /> exceeded. <br /> 0.0 = � _ #VALUE! Perforations Select Type of Manifotd Connection (End or Center): <br /> Spacing=(Length of Lateral)/(Number of Perforations-1) ❑ E"d ❑ cen°e` <br /> (� ) = l #### Perforations-1) _ #### ft <br /> Lateral 5 GPM=Length of Lateral X Gallons Per Minute Per Foot(Line 8) <br /> �O ft X 0.30 GPM/Ft= O.O GPM <br /> Number of Perforations=GPM/Flow Rate for Lateral 2(Line 6.5) Check Tabte to ensure the maximum number of perforations is not <br /> exceeded. <br /> 0.0 .- � _ #VALUE! Perforations Select Type of Manifold Connection (End or Center): <br /> Spacing=(Length of Lateral)/(Numberof Perforations-1) ❑ E"d ❑ cenre` <br /> (� ) � ( #### Perforations-1) _ ####ft <br /> 10. Catcutate Total GPM for system-the total GPM need from the pump. <br /> Lateral 1 Flow + Lateral 2 Flow + Lateral 3 Flow + Lateral 4 Flow + Lateral 5 Flow = Total Ftow '�`•�k 3 a rt`'�% <br /> 'v ft n,, <br /> 9.0 + 9.0 + 0.0 + 0.0 + 0.0 - 18.1 GPM <br /> 11. Summary <br /> Enter the minimum pipe size that allows for even distribution and the votume of liquid in the pipe from Volume of Liquid in <br /> the tabte. �Pe <br /> Totat Volume �pe Liquid <br /> Pipe Volume Pipe Length to Fill Pipe Perforation Diameter Per Foot <br /> Pipe Size(in) (gat/ft) (ft) (gal) Size(in) Spacing(ft) (inches) (Galions) <br /> �aterat 1 1.5 0.110 30 3.3 7/32 2.0 Highest 1 0.045 <br /> �aterat 2 1.5 0.110 30 3.3 7/32 3.8 1.25 0.078 <br /> Lateral3 0 #VALUE! �•5 0.110 <br /> 2 0.170 <br /> �ateral4 0 #VALUE! 3 0.380 <br /> Lateral5 0 #VALUE! Lowest 4 0.661 <br /> Total Volume of Distribution Piping= 6.6 ,�?4 ` E 5, <br /> Min.Detivered Dose Yolume=Five X the Total Volume of Piping= 33.0 y�-_. �,� <br /> I hereby certify that t have compteted this work in accordance with all applicable ordinances, rutes and laws. <br /> .� <br /> -` ' -- _ <br /> Joseph J Olson '�`"'���-J 810 05/10/11 <br /> �.. <br /> (Designer) - (Signature) (License tl) (Date) <br />