Laserfiche WebLink
� <br /> SXstem S�ecifications <br /> Pump Tank: <br /> • A 2.5 inch electrical conduit is to be used for the pump cords <br /> • The piping is to accessible from ground level for future repair <br /> • The supply line leaving the tank is to be sleeved over any excavated ground <br /> in 4" sch 40 PVC and sealed with a 4� Fernco <br /> • The floats are to be installed on a float tree <br /> • The pump must be placed on a pump block <br /> • A minimum of a �/4" drainback hole must be drilled in the supply line to <br /> avoid freezing <br /> Blow-outs are to be installed on the ends of all pressure lines <br /> All run-off water is to be diverted away from the tanks and drainfield areas <br /> Plastic bolt down manhole covers are to be used and left at grade level for <br /> maintenance access. <br /> Pressure rate glue joint fittings must be used. <br /> If the septic tanks are less than 2' deep the covers are to be insulated with 2" high- <br /> densi foam <br /> It is the installer's responsibility that all sewerlines leaving the structure have been <br /> connected to the new system <br /> ,, Syster�will use the 2 existing s�ptic tanks. <br /> 1Vlaterials will need to be carried with the skid loader around the north side of the <br /> home due to the lack of space. <br />