My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01281 - septic
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
185 Brown Road South - PID: 03-117-23-21-0021
>
Septic
>
2015-01281 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:34:19 PM
Creation date
2/1/2016 1:50:00 PM
Metadata
Fields
Template:
x Address Old
House Number
185
Street Name
Brown
Street Type
Road
Street Direction
South
Address
185 Brown Rd S
Document Type
Septic
PIN
0311723210021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zs) 0.78 gpd/ftz Absorption area Soil Loading Rate, which gives a mound ratio of 1.5 (minimum) <br /> (this must match the soil boring log) desired mound ratio 1.5 <br /> za� 10 percent site slope (0-20% range) 10 (%downslope site slope, if different than upslope) <br /> zs� 24 inches, or 2.0 ft. to Redox or other limiting condition (need at least 12"to be a Type I) <br /> Treatment zone contains�0 inches of 0%soil credit, and �0 inches of 50%soil credit. Giving a: <br /> 2�> 12 inch, or 1.0 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br /> z�� 15.0 ft.Total ABSORPTION width (with sand beyond rockbed as fotlows:) <br /> zs> 0.0 ft. upslope and sideslope <br /> 5.0 ft. Downslope <br /> Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br /> 29� 4:1 upslope ratio 9 ft. upslope berm <br /> 30� 4:1 sideslope 16 ft. sideslope berms <br /> 3i� 4:1 downslope 27 ft. downslope berm <br /> 32� Overall Dimensions: 10.0 ft. wide by 50.0 ft. long Rock bed <br /> 46 ft. wide by 82 ft. long Mound footprint <br /> 4" inspection pipe <br /> 18" cover on top <br /> U lo berm 0 pvwnslo e berm 27 <br /> 12" cover on sides <br /> (6"loemy cap&6"topsoil) <br /> 1.0 ��ean sand lift <br /> _ 2,0 Depth to Limiting <br /> �imitingCondition —'a—`--�--��_— __�__ <br /> Absor tion Width � �5.0 � --�---�---� <br /> Note: <br /> �ur 0 to 1�slopes, sJ6sorpt�nn J�'dth is measured from the Bedequally in both directions. <br /> For slapes >1�, A6sasrpt/an WYdth is measured downhill from the upslope ed�e of the Beo: <br /> ss> Rock Bed: <br /> 10.0 ft. by 50.0 ft. by �inches under pipe, plus 20%gives 17 yd'or*1.4= 24 ton <br /> 3a) Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 15.7 up + 82.3 downslope + 13.3 ends+ 27.8 under rock= 167 yd'or*1.4= 234 ton <br /> plus 20% <br /> ss� Loamy Cap: <br /> 42 ft. by 78 ft. 6"deep, plus 20�gives 73 yd'or*1.4= 102 ton <br /> 36) TOpS01�: <br /> 46 ft. by 82 ft. 6" deep, plus 20%gives 84 yd'or"1.4= 118 ton <br /> 1 hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> 7/31/2015 <br /> Designer Signature Company License# Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.