My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sewer info
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
140 Brown Road South - PID: 03-117-23-12-0011
>
Land Use
>
Sewer info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:08 PM
Creation date
1/29/2016 2:55:37 PM
Metadata
Fields
Template:
x Address Old
House Number
140
Street Name
Brown
Street Type
Road
Street Direction
South
Address
140 Brown Rd S
Document Type
Land Use
PIN
0311723120011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� • Revision 12-14-II <br /> i <br /> and operable to a11ow such service. Orono agrees to maintain, at its sole cost,that portion of the ; <br /> water/sewer system that is located within the boundaries of City of Orono. Long Lake agrees to <br /> � maintain, at its sole cost,that portion of the water/sewer system that is located within the , <br /> boundaries of the City of Long Lake. <br /> 4. USAGE CHARGES. <br /> � <br /> a. Properties with Sewer Onlv. Because one or more properties in the ' <br /> Creekside Service Area do not have access to municipal water or have not yet connected to <br /> available znunicipal water,the use of water billing flows for sanitary sewer billing purposes is not <br /> feasible ("Sewer Only Properties"). Also,the use of sanitary sewer flow metering is not practicaI or <br /> feasible based on the limited number of residences which are Sewer Only Properties. Therefore, for <br /> sanitary sewer billing purposes for the Sewer Only Properties, Long Lake will quarterly invoice <br /> Orono a standard flat rate sanitary sewer charge based upon the average calendar first quarter <br /> municipal water usage for properties in the Creekside Service Area for each property�connected to <br /> Long Lake's sanitary sewer system. Orano will provide notification to Long Lake with the number <br /> of Sewer Only Properties and shall pay the flat rate for each such Sewer Only Pr�perty�within thirty <br /> (30)days of receipt of the invoice. .. <br /> b: Properties with Water and Sewex. For water and sewer billing purposes, <br /> Orono will read the water rneters for those properties connected to Long Lake's water system in the <br /> Creekside Service Area on a quarterly basis and forward the water usage information to Long Lake. <br /> Lang Lake will quarterly invoice Orono for such usage at the same biliing rate for both water and <br /> sewer that is chazged Long La1ce customers. Orono shall pay the invoice within thirty{30)days of <br /> receipt of the invoice. <br /> •n LONG LAKE SEWER CONNECTION CHARGES. Long Lake will bill0rono <br /> a sarutary sewer connection charge for each praperty designated as a Category 2 or Category 3 <br /> property in Exhibit A that connects to sanitary sewer in the Creekside Service Area. .Connection to <br /> the,sanitary sewer for Category 2 and Category 3 properkies is on a voluntary basis for each , <br /> property and is not mandated by the City of Orono. At any tiine upon request of Long Lake, Orono <br /> will provide Long Lake with the total number of properties connected to the sanitary sewer system, <br /> and will also notify Long Lake at the time each new connection occurs. The sewet cannectio� <br /> charges for Category 2 and 3 properties will be as indicated in Long Lake's fee schedule for the <br /> current year, and shall consist only of a hookup fee. The haokup fee shall be the same rate as that <br /> chaxged to Long La1ce residents. Orono shall pay the invoice within thirty (30) days of receipt of <br /> the invoice. Long Lake,with assistance from Orono, shall have the right to audit the number of <br /> homes within the Creekside Service Area that have sewer connections. Note that the Long Lake � <br /> connection charges for all Category 1 properties were paid in full at the time the subdivision was <br /> developed. <br /> 6. MCES CHARGES. <br /> a. MCES Sewer Availabilit�hazges. Orono will issue connection permits for each <br /> new conneciion and will eollect the MCES Sewer Availability Charge (SAC) and forward same to <br /> MCES. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.