Laserfiche WebLink
BUILDTiVG PERNIIT APPLICATION PROCEDURE -' <br /> �� <br /> Each application for a building permit shall be accompanied by the data indicated below. <br /> Failure to submit complete information will result in return of applications. Please read <br /> carefully the listed requirements. <br /> 1. ALL APPLICATIONS <br /> A. Completed application forms including all information required in the numbered spaces, <br /> dated and signed by applicant. <br /> B. Two copies of building plans, drawn to scale, together with specifications containing the <br /> minimum information noted below: (requirement for building plans may be waived by <br /> the Building Official for small structures or minor work). One set will remain on file <br /> with the City and one set will be returned to applicant. <br /> Residential Plan reviews will require a minimum of 7 to 10 working days for staff <br /> review. All new commercial structures must be approved by the Orono Council. <br /> Modification of existing commercial structures will require a minimum of 2 weeks for <br /> staff review. <br /> Minimum Information Required: <br /> 1. CERTIFICATE OF SURVEY (signed by a registered land surveyor). A survey <br /> is required for all types of construction including new homes, room additions, <br /> porches, decks and accessory buildings. The survey must include the legal <br /> description of property, location of existing and proposed structures on the site, <br /> location of all proposed improvements such as driveways, retaining walls, decks, <br /> sidewalks, etc. Lakeshore lots must show existing and proposed contours in <br /> minimum 2' increments. (Refer to minimum survey standards sheet on page <br /> 5 attached.) . <br /> Survey Requirement Exemption - A survey will not be required for detached <br /> accesso� structures of less than 1,000 s.f. in total floor area when all of the <br /> following conditions are met:�` <br /> a) The area of the property exceeds the minimum lot width/lot area standards <br /> � of the zoning district. <br /> � b) Owner/applicant has staked the location of the proposed structure meeting <br /> C the required setbacks, and the property corner pins are staked and visible <br /> t and a plot map of the property drawn to scale has been submitted. <br /> ; c) Owner/applicant has obtained written non-objection of most-affected <br /> � adjacent property owner. <br /> ; <br /> � <br /> *A survey will not be required for accessory structures without foundations and <br /> with less than 120 s.f. of projected roof area if b and c are met. <br /> A site inspection by City staff is required. Site inspection fee is $30.00 and shall <br /> � be paid with the building permit. <br /> �..�.�__._.__. <br /> 1 <br /> Once an unpro��,�•.....-- <br /> . ,___,. ,.,,.,r.,�r �r,ur assessor's office. <br />