Laserfiche WebLink
The 1999 connection charge for hookup to the North Long Lake sewer project is $19,380. <br /> Connection of this property will be into a forcemain sewer line, so a grinder pump will be <br /> required. Several properties in the North Long Lzke project required grinder pumps. As part of <br /> the project assessment, grinder pumps were furnished to the property owners. These pumps were <br /> installed by the plumber hired by the property owner to complete the sewer connection to the <br /> house. These grinder pumps are owned and operated by the property owners. There is an extra <br /> grinder pump available because the pump would not work for one of the property owners and they <br /> were given a credit to pay for their own pumping system. This grinder pump will be provided to <br /> Mr. Cox for installation by his plumber. Connection of this properry will require tapping of the <br /> forcemain in North Brown Road. We are recommending that City Engineer approval be required <br /> for the sewer connection plans and that construction inspection be required for any work in the <br /> public right of way. The property owner will be responsible for all costs associated with the sewer <br /> connection. <br /> COUNCIL ACTION REQUESTED: <br /> Motion to approve use of one sewer unit for connection of 925 North Brown Road to sanitary <br /> sewer with the property owner responsible for all costs associated with hookup, including the <br /> connection fee for the North Long Lake sewer project, and City Engineer plan approval required. <br />