Laserfiche WebLink
r <br /> MECHANICAL SYSTEMS BEING INSTALLED � <br /> Note: All Geothermal Systems will now require a Site Plan& Review by our Building Official. <br /> IS THIS GEOTHERMAL? ❑ Yes 0✓ No <br /> HEATING SYSTEMS <br /> Quantity: � <br /> Make: RUUD <br /> UGPN07 <br /> Model: <br /> FueL• Nat. Gas <br /> Flue Size: <br /> Input BTUs: �0,000 <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Tons: <br /> H.Power <br /> FIREPLACES <br /> ❑ Gas Factory Fireplace Brand Name: <br /> ❑ Wood Burning Fireplace <br /> � Wood Stove Model No.: <br /> ❑ Wood Stove With Flue <br /> VENTILATION <br /> ❑ No. Kitchen Exhaust duct recirculating cfin <br /> ❑ No. Bath Exhaust(must have duct outside) cfm <br /> ❑ No. Other Fans: Locations cfin <br /> FUEL STORAGE (Must be approved by Fire Marshall if p�oposing to abandon tank in place.) <br /> � Installation a Removal <br /> Fuel Oil: gallons ❑ Underground a Inside �Outside <br /> LP Gas: gallons <br /> Other: <br /> GAS LINE ONLY <br /> ❑ Outdoor Grill � Qther/List What& Where: <br /> 2 <br />