Laserfiche WebLink
. DETERMINING PERMIT FEES <br /> ❑SAC Charge(2005 Rate=$1,450.00) $ <br /> (SAC Charge must accompany all sewer pernut applications unless prepaid) <br /> (Orono City Staff can deternune if applicable) <br /> (If not prepaid, a sewer con ction permit will not be issued) `� <br /> �Sewer Connectio /Di connect/ epair($35.00/Per Stub) $ <br /> Pipe size i hes� Schd 40 air tested; cast iron <br /> ❑Water Connection/Disconnect/Repair($35.00/Per Stub) $ <br /> Pipe size inches; material Schd 40 air tested; copper <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ .50 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ <br /> ADDITIONAL INFORMATION-WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate pemut. u. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in stric accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, an c rtifies that all statements made on this application are,true and correct. <br /> Applic � Date: �"� ' �� <br /> 4 <br /> q <br /> � iQ <br /> � � <br /> . . . . . - . .. . I ���' <br /> . . . . ��. ; p � 1Ik <br /> � � �� I ,. � � ��� , �-� �� ��� <br />