Laserfiche WebLink
Recommendations <br /> We are recommending sewering this property using one of the fifty sewer units available from <br /> the 1996 MUSA expansions Comprehensive Plan amendment. This is based on the fact that the <br /> property is a previously developed lot that used to have a nonconforming septic system for the <br /> existing house, which was demolished in 1996. The property is located directly adjacent to Dickey <br /> Lake, and sewering of the property will provide a higher level of protection for Dickey Lake than <br /> using a septic system. This property is also located in the new Comprehensive Plan MUSA <br /> expansion area. <br /> The 2000 connection charge for hookup to the North Long Lake sewer project is $19,380. <br /> Connection of this property will be into a force main sewer line, so a grinder pump will be <br /> required. The property owner will be responsible for the installation and maintenance of the <br /> grinder pump. Connection of this property will require tapping of the force main in North Brown <br /> Road. We are recommending that City Engineer approval be required for the sewer connection <br /> plans and that construction inspection be required for any work in the public right of way. The <br /> property owner will be responsible for all costs associated with the sewer connection. <br /> COLTNCIL ACTION REQUESTED: <br /> Motion to approve use of one sewer unit for connection of 809 North Brown Road to sanitary <br /> sewer with the property owner responsible for all costs associated with the hookup, including the <br /> connection fee for the North Long Lake sewer project, and City Engineer plan approval required. <br />