My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
809 Brown Road North - 27-118-23-34-0006
>
Septic
>
Septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:21:22 PM
Creation date
1/26/2016 1:32:15 PM
Metadata
Fields
Template:
x Address Old
House Number
809
Street Name
Brown
Street Type
Road
Street Direction
North
Address
809 Brown Road North
Document Type
Septic
PIN
2711823340006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> M <br />, � iJ�� TESTING� 11� C. Steven 8. Schirmers — MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> November 15 , 1995 <br /> Dennis Platteter <br /> 809 No. Brown Rd . <br /> Lot l, �31ock 1 <br /> Orono, Henn . Co. , MN <br /> This On-Site Sewage Treatment System is Designed for a Type 1, five <br /> bedroom home Designed in accordance with the Minnesota Pollution <br /> Control Agency Chapter 7080 and local ordinances . <br /> The soils ,on thi.s site are a clay loam. The seasonally saturated <br /> soils were located at 12" to 24" below the ground surface. Due <br /> to the seasonally saturated soil , a Pressurized Mound System will <br /> need to be installed to treat septic effluent. <br /> This site has an existing Non-Conforming System with the bottom <br /> less than 3 ' from mottled soil . The existing tank may be used <br /> if water tight, if new construction the existing tank will need <br /> to be abandoned, pumped & filled with soil . <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 15 . 5 min/inch. <br /> A pumping chamber will need to be installed to lift the effluent <br /> to the treatment area. <br /> The manifold and supply line pipe must have back drainage to the <br /> pumping chamber. The distribution pipes shall have their ends <br /> capped. Be sure the rock and sand fill material are clean. The <br /> sod layer below the entire mounded area must be turned over, just <br /> break up the sod , be sure not to over work. <br /> The power supply and switches must be located outside the manhole <br /> and pumping chamber in a weather proof enclosure. A warning device <br /> must be installed with a light and sound device, this is in case of <br /> a pump failure . <br /> All neighboring wells are located greater than 75 ' away from the <br /> proposed treatment area . <br /> Keep all heavy equipment off of the proposed treatment area before <br /> and after construction. The treatment area should be marked off <br /> before construction. This Design is not valid & the system will <br /> need to be relocated if failure to protect the areas proposed <br /> for On-Site Sewage Treatment occurs . <br /> CONT' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.