Laserfiche WebLink
/���1 \\\� <br /> �/ 7 � �� <br /> / O�/ O��v�, <br /> �- ����� c�TY of o�o�o <br /> ; �, <br /> ��, '� � , _ �%� Municipal Offices <br /> 1 r �' <br /> �� � �. ,� � � ti ;i <br /> „'� '`"` � � ` G,�% Street Address: Mailing Address: <br /> '����9 4L�'� 2150 Kelley Parkway P.O. Box 66 <br /> � ����,kESHO�', <br /> ����� Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address �`�� Il) ��G�� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewa�e treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No ._� <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes <br /> No �^ <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �r_r?--c�S . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> '. �I Date of Inspection � 'd� <br /> Telephone(952)249-4600 • Fax (9�2)249-4616 <br /> www.ci.orono.mn.us <br />