Laserfiche WebLink
1 <br /> Iapplication are among the materials that you may be required Co submit if impacts are proposed for <br /> the delineated wetlands. By initiating the permit process as soon as possible,potential costly delays <br /> Ito the project may be avoided. <br /> � CERTIFICATION <br /> � Ben Carlson and Brian Bur ner com leted the above-described delineation on Octol�er 2,2007.This <br /> g P <br /> � delineation was performed according to the procedures described by the US Army Corps of <br /> Engineers in the 1987 Wetlands Delineation Manual and the 2007 Midwest Region Supplement <br /> Wetland Delineation Manual. The delineat�on meets the standards and a cntenon described m these <br /> � manuals and conforms to the applicable standards and regulations in force at the time the delineation <br /> was completed. <br /> � Report prepared by Ben Carlson (Wetland Ecologist II), and graphics prepared by Josh Johnston <br /> (G1S Specialist) on this day, October 9, 2007. <br /> � Client: Ted Schultze <br /> Project Name: 744 Brown Road North <br /> Project No.: 2007-081-03 <br /> � Location: Orono, Minnesota <br /> � Ben Carlson, WDC <br /> , Wetland Ecologist II <br /> Josh Johnston <br /> , GIS Specialist <br /> �...�.�.D�.� d. � <br /> � President, Svoboda Ecological Resources <br /> ' October 9, 2007 <br /> Date <br /> , <br /> ' <br /> ' Svoboda EcoloQical Resources 744 Biro�m Road North <br /> Project No.: 2007-081-03 9 Ted Se�hultze <br /> 1 <br />