Laserfiche WebLink
� � 740 No. Brown Rd. <br /> ( 2) <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction as much as possible. The treatment area should be <br /> marked off before construction. <br /> With proper installation and maintenance, this system should have no <br /> problem in t�reating septic effluent effectively. <br /> Recommend to pump the septic tank every year if there is nnly 1 tank <br /> & every 2 years if there are 2 tanks . <br /> Sl�.�.x-�- . <br /> Steven B. Schirmers � <br /> SBS/ds <br />