My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01021 (septic)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4495 Bayside Road - 06-117-23-21-0004
>
Septic
>
2012-01021 (septic)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:26 PM
Creation date
1/22/2016 3:39:54 PM
Metadata
Fields
Template:
x Address Old
House Number
4495
Street Name
Bayside
Street Type
Road
Address
4495 Bayside Rd
Document Type
Septic
PIN
0611723210004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 3. ,ABSORPTION AREA SIZING <br /> � Note:Mound setbacks are measured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.6)X Mound Absorption Rotio (1.F)=Absorption Width <br /> 10.0 ft X 2.0 = 20.0 ft <br /> B. For slopes>1%,the Absorption Width is measured downhill from the upslope edge of the Bed. <br /> Calculate Downs(ope Absorption Width:Absorption Width (3.A)-Bed Width (2.6)=ft <br /> 20.0 ft - 10.0 ft = 10.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate Clean Sond Lift: 3 feet minus Depth to Limiting Condition (1.C)=Cleon Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.8 ft = 1.2 ft Design Sand Lift(optional): �1.2 <br /> B. Calculate Upslope Hei3ht:Cleon Sand Lift (4.A�+media depth (1 ft.)+cover (1 ft.)=Ups(ope Height <br /> 1.2 ft + 1.0 ft + 1.0 ft= 3.2 ft <br /> : ;:��o.e G,u�.�ml;e��acl� <br /> � LandSfope`b o i � 2 3 a 5 6 1 s 4 i0 ii i2 �3 i ia i5 i(� !7 � ?B 1? ; i�+�1i ii I �3 � t» � t; f <br /> i I.✓.I�pa ',i:t ?C� 2.`;1�233�'t.'c :6k [.51 L$= 2.J3 i.a2 •'_.3�i� sliZ'b�:.Lljt'J�2.': �:4 LUS !.U; 'ik i.i? I.ii� I.i; I'�� � L�4�1 tl��Ls?i <br /> � E'�tRl n<�n ;.l:1 �.� 3.85�3JU 3.51 ;.�15 l.i3�31i�3.i2 3.03 t.9�1 t.d5.2]E i.10 `t.bi 2.55 2.� t.dt 235 ?.24 2..s 2,18 L!i 2..8�2.Gi L9S i.4's' <br /> , Land$lope.`�: � I ' t 3 4 S b 7 8 9 10� I I 12 13 14 IS 15 11 18 19 10 2I 22 23 24 2S � <br /> � �0'::I1S�Ct;� �:I lty' �QY�i.'9�'s30 :.�t1�:.S?13.56�;.@L 3.�ii 1.11 �t2l�J.� �7�;4��itli5.i5 S.r3 �.2- E.6: 7.N '.J' '.9; 9.�� d.ii i.-!F ,_ <br /> I Rp���1Rdi'�� �'d:i ;.t�G a,;?�a.;5 d,5-1 .?5 5�4�0 5.25 5.�6 '.R8 E.25,6.b7 ?.1,�7.6YIa.2518:�2 9.57 10.'[4 Ip,S-4 it.57 12.�t1 ;3.19 13.99 �d,82I'S.E7�'6.�=11�.�i=; <br /> Select Upslope Berm Muftiplier <br /> �' (based on land slope): 2.21 (figure D-34) <br /> D. Calcutate Ups(ope Berm Width:Multiplier (4.C)X Ups(ope Mound Heiqht (4.6)=Ups(ope Berm Width <br /> 2.21 ft X 3.2 ft = 7.0 ft <br /> E. Calculate Drop in E(evation Under Bed:Bed Width (2.B) X Land Slope (1.D): 100=Drop (ft) <br /> 10.0 ft X 12.0 % : 100= 1.20 ft <br /> F. Calculate Downslope Mound Height:Ups(ope Height (4.6)+Drop in E(evation (4.E)=Downsfope Height <br /> 3.2 ft + 1.20 ft = 4.4 ft <br /> G Select Downslope Berm Multiplier <br /> (based on land slope): 4.69 (figure D-34) <br /> H. Calculate Downslope Berm Width:Muttiplier (4.G)X Downs(ope Height (4.F)=Downslope Berm Width <br /> 4.69 x 4.4 ft = 21.0 ft <br /> 1. Calculate Minimum Berm to Cover Absorption Area:Downslope Absorption Width (3.6 or 3.C)+4 ft. =ft <br /> 10.0 ft + � ft = 14.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 21.0 ft <br /> K. Select Ends(ope Berm Mu(tip(ier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endstope Berm (4.K)X Downslope Mound Height (4.F)=Ends(ope Berm Width <br /> 3.00 ft x 4.4 ft = 13.0 ft <br /> M.Calculate Mound Width: Upslope Berm Width(4.D)+Bed Width (2.6)+Downslope Berm Width (4.J)=ft <br /> 7.0 ft + 10.0 ft + 21.0 ft = 38.0 ft <br /> N. Calculate Mound Length:Endslope Berm Width (4.L)+Bed Length (2.C)+Ends(ope Berm Width (4.L)=ft <br /> 13.0 ft + 63.0 ft + 13.0 ft = 89.0 ft <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.