My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01021 (septic)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4495 Bayside Road - 06-117-23-21-0004
>
Septic
>
2012-01021 (septic)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:26 PM
Creation date
1/22/2016 3:39:54 PM
Metadata
Fields
Template:
x Address Old
House Number
4495
Street Name
Bayside
Street Type
Road
Address
4495 Bayside Rd
Document Type
Septic
PIN
0611723210004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, �� OSTP Pressure Distribution <br /> Minnesota Poitution UNIVERSITY ,��, <br /> Design Worksheet OF MINNESOTA <br /> Control A ency �``�"�.�" <br /> ProjectlD: v 11.09.22 <br /> 1. Select Number of Perforated Laterals in rystemlzone: � - - -- - <br /> (2 feet is minimum and 3 feet is maximum spacing) �� �����"� ��" <br /> ;:'.o,���„�. ' <br /> 2. Select Perforation Spacing: 3.0 ft � ,, __ <br /> M�n�inu�n " <br /> '/."�����lui:����i�v l�i.��.•il 3':i�i.��� t'_l"�I ro�.k 1)' <br /> 3. Select Perforation Diameter Size 1/4 in _ _ <br /> !�'c�.�ack <br /> 4. Length of Laterals =Media Bed Length -2 Feet. °o"°"""°' ,° `°',°',°°"`,'., ," ' ,' <br /> 50 - 2ft = 48 ft Perforation can not be doser then 1 foot from edge. <br /> 5• Determine the Number of Perforation Spaces. Divide the Length of Latero(s (Line 4)by the Perforation Spacing (Line Z)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 48 ft .- �ft = 16 Spaces <br /> 6. Number of Perforotions per Lotera( is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Latera( = 16 Spaces + 1 = 17 Perfs. Per Lateral <br /> Check tab(e below to verify the number of perforations per(ateral guarantees less than a 10%discharge variation. The va(ue is <br /> double if the a center manifo(d is used. <br /> M,a�cimum Numher af P?rfe�atians�er LatEral to G�r,r:tee<:1�Oischarge VaRal'�o€t <br /> ',Inch P arat�ons ?�32 Inch Perforations <br /> Fipe(iie �ter(IncF.e:l F'a�cratio,-,5p�:inQ F7pe CratT?�TEr(tnthesl <br /> P?�t,:raC•o-�Spat'ng iF�tl - <br /> t 1��: S1: 2 3 (F�tl I ty< 11: Z 3 <br /> � tn f3 18 30 5�1 2 tt 16 2t 34 hfl <br /> ��: � i2 16 2? 54 2�: t0 14 �0 32 64 <br /> ? E fi1 16 25 52 3 9 1� 19 30 60 <br /> 3'161nch Perfarations 1.'8 Inch Peffarat�ons <br /> Pipe Dia�t�fl�ches) Fp+-foretion Spa�in� Ftip?C.*arteter((r.c�+es? <br /> FY�crec��n Spacng iFeetl <br /> 1 1!: t'�: 7 3 (t�il 1 ti'< 11: 2 ? <br /> 2 12 18 26 4b 87 2 21 ?3 �3 7�# 144 <br /> ?t= tt 17 14 �� 80 2�: .�� 3C� st �v 131 <br /> ? 12 1h Z2 37 75 3 20 29 38 64 128 <br /> 7• Total Number of Perforotions equals the Number of Perforotions per Loteral (Line 6)muttiplied by the Number of <br /> Perforated Loterafs (Line 1). <br /> 17 Perf. Per Lateral X �Number of Perf. Laterals = 51 Total Number of Perf. <br /> 8. Catculate the Square Feet per Perforation. Recommended volue is 4-10 ft z per perforation. Pe<<°�°"°^°,��h••��°'"� <br /> Does not app(y to At-Grades ! �.ro..no„o�.me«� <br /> He.e,re,I <br /> Bed Areo = Bed Width (ft)X Bed Length(ft) ; '�6 '��� �,_ �. <br /> 1.0' D.16 0.41 0.56 0.7� <br /> 1.5 0.22 0.51 0,69 0.9 <br /> 10 ft x 50 ft = 500 ftZ Z.°° °.� °.5' °.� ,.°' <br /> 2.5 0.29 0.65 0.69 1.17 <br /> 7.0 0.32 0.72 0.96 1.28 <br /> Square Foot per Perforation =Bed Area divided by the Tota(Number of Perforations (Line 7). <.o I o.» o.e= ,.,� ,._� <br /> SA` O.{1 0.93 /.26 1.65 <br /> 50o ftZ - 5� erforations = � Z 1�ooc IC�Iiingvri��>/t6inthtot/4irch <br /> p 9.8 ft /perforations oe o�a��am <br /> Dwellirc�s with 1/B inch pertoratiom. <br /> :feet Other r.eaFAishmenu and�'STS v+ith 3!16 <br /> 9. Select Minimum Average Heod: 1.0 ft iinch to tia inch peAaratbrrs <br /> 5��, CRner rstabtishme�t,and�+STS wich t!g inch <br /> �DeAora�io�tt <br /> 10. Select Perforation Dischorge (GPM) based on Table III: 0.74 GPM per Perforation <br /> 11. Determine required Flow Rote by multiplying the Total Number of Perforations (Line 7)by the Perforation Dischorge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.