My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cert of Occup
Orono
>
Property Files
>
Street Address
>
B
>
Briar Street
>
1380 Briar Street - 10-117-23-31-0053
>
Misc
>
Cert of Occup
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:23:59 PM
Creation date
1/20/2016 3:48:46 PM
Metadata
Fields
Template:
x Address Old
House Number
1380
Street Name
Briar
Street Type
Street
Address
1380 Briar Street
Document Type
Misc
PIN
1011723310053
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Thursday, December 29, 2016 11:15 AM <br /> To: 'Jeff Zitzloff' <br /> Cc: Mark Gronberg <br /> Subject: 1380 Briar Street/#2015-01228 <br /> � <br /> Jeff, <br /> Our engineer has reviewed the as-built survey and has the following comments: <br /> a. The as-built survey does not appear to conform to the intent of the approved plan.The as-built survey does <br /> not depict the approved surface drainage plan. The approved plan included swales to direct any surface <br /> runoff away from the eastern and northern neighboring lots. If swales were created but not visible due to <br /> the contour interval,drainage arrows should be used. If another mechanism/plan was used to deal with run <br /> off it should be depicted or described. Please have the survey updated to show drainage patterns or other <br /> mechanisms used. <br /> b. The as-built survey shows an existing concrete foundation and floor to be removed on the south side of the <br /> property. This does not show up on the hardcover calculation. Does it exist or has it been removed? Please <br /> provide clarification. <br /> After the updated survey is received and snow has melted, an inspector will visit the site to con�rm the following: <br /> a.The survey accurately depicts conditions on the ground. <br /> b.The site is stabilized to the point the any remaining erosion control can be removed. <br /> c.The drainage pattern does not direct surface water onto the neighboring properties. <br /> Once the as-built survey and site visit have been completed and approved we can refund the escrow money current <br /> held. <br /> If you have any questions, please don't hesitate to contact me. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN � 55356(physical addressJ <br /> PO Box 66 � Crystal Bay � MN � 55323-0066(mailing address) <br /> '� 952.249.4620 I 8 952.249.4616 <br /> �cmattson@ci.orono.mn.us � �www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE W/LL BE CLOSED: Monday,January 2,2017 <br /> Monday,January 16,2017 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.