Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Friday, October 30, 2015 2:18 PM <br /> To: Christine Mattson <br /> Cc: Melanie Curtis <br /> Subject: RE: 1380 Briar Street/#2015-01228 <br /> Chris, <br /> I've reviewed the subject Plan and stamped it approved. <br /> The applicant must establish the erosion control and have it inspect by a city inspector prior to disturbing soil. The <br /> erosion control should include a rock construction entrance. <br /> Adam <br /> From: Christine Mattson <br /> Sent: Friday, October 30, 2015 11:30 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Cc: Melanie Curtis<MCurtis@ci.orono.mn.us> <br /> Subject: RE: 1380 Briar Street/#2015-01228 <br /> Adam, <br /> We received an updated survey for this project. Please review and provide comments. <br /> Thanks! <br /> From: Adam Edwards <br /> Sent: Monday, October 12, 2015 2:48 PM <br /> To: Christine Mattson<CMattson@ci.orono.mn.us> <br /> Subject: RE: 1380 Briar Street/#2015-01228 <br /> Chris, <br /> I have reviewed the subject plan and offer the following comments: <br /> 1. The survey does not comply with the City Survey standards: <br /> a. Missing Graphic Scale (#1) <br /> b. Missing Total Square Feet (#3) <br /> c. Missing Trees over 6" diameter within the disturbance area (#8) <br /> d. Missing%grade is on the driveway(#22j. <br /> 2. The driveway is depicted at 21ft wide where it meets the edge of black top.The maximum allowed is 20 ft. <br /> 3. Plan appears to increase the hardcover by�x3. The lot is relatively flat without access to a Stormwater <br /> system. What is the drainage plan/plan to manage the Stormwater on site? In particular on the East side of <br /> the proposed house. <br /> Adam <br /> 1 <br />