Laserfiche WebLink
• 4. Submit a $2,500 escrow and an escrow agreement signed by the property owner(copy attached). <br /> • 5. Keep all structure(s) enclosed and/or secured until such time as demolition is complete. <br /> 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior <br /> approval is obtained in writing for temporary use thereof. <br /> 7. Completely remove foundation(s)from the ground. <br /> 8. Completely dispose of ait demolition debris off site in accordance with all applicable PCA requirements. <br /> 9. Abandon water wells in accordance with State Health Department regulations. <br /> 10. Call for an inspection when all debris has been removed, before backfilling. <br /> 11. Within 5 working days of superstructure removal, a fina! inspection shall be requested. The site shall be <br /> left clean and clear of all debris, with any excavation filled with earth level with the adjacent ground <br /> elevation (except when such excavation is to be used as part of a new building and such new building is <br /> actuaily under construction). <br /> 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed <br /> and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are <br /> crushed and filled. <br /> 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, <br /> employees and assigns from and against all claims, damages, losses or expenses, including attorney <br /> fees, against the City, its agents, employees and assigns arising out of or resutting from the demolition <br /> described herein as performed by the property owner, his employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> [� $75.00 — Principai Structure $_ 7s�, o0 <br /> �$50.00 — Accessory Structure x�(how many) 5�•�V <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge 1.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do <br /> ali the work in a strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are complete, true and correct. <br /> Applicant's Signature: Date: �� �� <br /> Owner's Signature: � Date: <br /> Approved By: Date: i�_ � � <br /> uilding Official) <br /> *Zoning Disclosure Required? ❑ YES �'�NO �� u,� � �5 3�� <br /> 'This must be filled out by Zoning Department— For ei fer�swer, a Zoning Official must sign all applications. <br /> * Approved By: ,Y V��� Date: �V • ' ' �� <br /> (Zoning Official) <br /> Form Last Updated. July 2015 <br /> 1507R4 <br />