Laserfiche WebLink
........... ­'­'_­"'__­'­-..._­­ ... .... <br />..... . ...... ...... <br />.......... <br />. ..... ........... ........... <br />. . ............ <br />• <br />iA <br />... ....... ........ ........... <br />J, <br />1. :DUCT --J <br />EF -1 <br />........ .. <br />.. ..... E'X" H14 'A''U'S T 'A' I R"' <br />1200 CFM .......... <br />VOLUME DAMPER <br />COORDINATE LOCATION <br />I WITH ARCHITECT <br />LOUVER <br />EXISTING MIXING PLENUM ADJUST FAN SPEED <br />EXISTING FILTER/ PLENUM BOX TO MAINTAIN 1000 CFM <br />All QUANTITY, REPLACE <br />FAN SHEEVE AS <br />REQUIRED <br />CFM <br />F < <br />FAN 1000 <br />& 00 SECTION <br />B <br />INSTALL NEW SLIP <br />IN ELECTRIC <br />REHEAT COIL (SEE <br />A OUTSIDE AIR NOTE 2) <br />500 CFM <br />NEW CHILLED WATER <br />COIL (SEE NOTE 1) <br />,xe RETURN AIR <br />500 CFM <br />EXISTING AHU-3 <br />NOT TO SCALE <br />ADJUST SHEAVE & DAMPERS <br />TO EXHAUST 750 CFM <br />EF -1 <br />SYNDER GENERAL <br />MODEL No: ILB1.20A <br />EXISTING SPA EXHAUST <br />AIRFLOW DIAGRAM <br />NOT TO SCALE <br />. ......... <br />.................. .. .. <br />... ......... <br />........... ....... ...... <br />. . . . . . . . . . <br />............ <br />11� .............. <br />................. <br />. .......... <br />........ IA <br />...................... ............. ...... - - ........ ........... <br />L <br />14i <br />EXISTING AHU-3 <br />�oo <br />.......... ...................... ... ....... ............................................. <br />----NEW Y4" CW WITH 1"THICK INSULATION <br />FIELD VERIFY LOCATION r —Tr TT__ —I <br />CAP FOR FUTURE CONNECTION <br />FOR PUMPS It <br />2 <br />L <br />J .. ........ . .... <br />EXIST. WALL HYDRANT <br />......... .. <br />4 <br />CONFIRM EXACT LOCATION <br />-3— <br />P 2 <br />... ..... .... ..... K 1W <br />....... .. . <br />.. .......... ...... <br />• tJ <br />... ... . .... � s f <br />. ........... <br />................ <br />— ------------- ----- — - - <br />................... k . . . . . . . . . . . . . . . . . . . <br />J <br />1 x" ...... <br />> <br />CONTRACTOR TO <br />FIELD VERIFY <br />........... <br />. ... ........ <br />ROUTING <br />....... . .. <br />.............. <br />....... ..... <br />......... .......... <br />... . .. ... .... ....... IA......................... ........... <br />I I I ................... . <br />........... ................. .......... <br />• <br />- ------ --------- <br />NEW CHILLER <br />.................. . <br />"'L ............ ................. .... ........ <br />------ - ---- - ACG -3N <br />--------- EXISTING CONDENSING <br />}_ - --_ J -f -----}-I <br />UNIT <br />r--- --- i <br />IL <br />NTRACTOR TO FIELD — — — —LLOCATE NEW <br />I CHILLER 6' FROM <br />RIFY ROUTING rll'e <br />FROM EXISTING <br />CONDENSING UNIT <br />NEW CHILI <br />COOLING <br />REPLACE <br />EXISTING / <br />ROOM PLAN <br />1/8 04 -On <br />RELIEF VALVE PIPED TO FLOOR <br />r)D A 1KI CET a rn r)Cf/% <br />1h' UNDERGROUND PIPING <br />NOTES: <br />1. REMOVE EXISTING DX COIL AND CONNECTING REFRIGERANT PIPING. <br />INSTALL NEW CHILLED WATER COOLING COIL. <br />2. ELECTRIC REHEAT - 11.5KW (208V/30) WITH SCR CONTROL. <br />INDEECO OR EQUAL SLIP -IN UNIT, MODEL QUA. <br />3. INSTALL 18% 12" RETURN GRILLE WITH SEPARATE VOLUME DAMPER. <br />PATCH CEILING AS REQUIRED. <br />4. ALL HIGH POINTS IN WATER LINES TO BE PROVIDED WITH AUTOMATIC <br />AIR VENTS, LOW POINTS WITH HOSE BIB DRAIN VALVES. <br />5. SUPPORT P-1,2 WITH SPRING HANGER RODS IF SUPPORTED FROM <br />CEILING BEAMS. <br />6. PROVIDE FLEXIBLE CONNECTIONS AT PUMP SUCTION AND DISCHARGE. <br />(7D REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCTWORK TO POINT <br />INDICATED. BLANK OFF LOUVER OPENING WITH 1} " THICK INSULATED <br />SHEETMETAL PANEL CAULK SEAL ALL SEAMS WATER TIGHT. <br />REMOVE EXISTING TEMPERATURE SENSOR AND INSTALL NEW TEMPERATURE <br />SENSORS. <br />PROVIDE NEW 24x6 DUCT WITH VOLUME DAMPER CONNECT TO RETURN <br />GRILLED. I <br />PROVIDE NEW 186 EXHAUST DUCT CONNECT TO EXIST 48x6 DUCT AND <br />EXHAUST FAN. RECONFIGURE INLET DUCT TO EF -1 TO CONNECT TO <br />18x18 DUCT. REBALANCE EXHAUST FAN AND DUCTS TO AIR QUANTITIES <br />INDICATED. <br />9 L-IVII L -i %r,% I %J1 %L. %JM%JVL. <br />1 <br />Issued/Revised De9criptimi <br />No. ] Date <br />SOUTHWAYS <br />VALVED PRESSURE GAUGE <br />NEW CHILLER <br />ACC -3N <br />UNION <br />VIBRATION ELIMINATOR <br />TRANE CGA -120 <br />Drawing Title <br />SPA AC, AIRFLOW <br />& WATERFLOW <br />DIAGRAMS <br />Scale AS NOTdED <br />Date <br />Project No. 92090.04 <br />Drawing No. <br />it fklnTl nsmin r1A It 4 ruan r13 <br />B ever <br />Blinder <br />Belle <br />CITY OF ORON <br />BU1Lf1NG-;P R 111 T IR LAN Fr? L',',•_1 <br />Architects & Planners <br />INSPECTOR <br />DATE -OD <br />41 East 11 Street <br />NOTEL <br />New York, New York 10003 <br />212 777 7800 <br />keqdzma; -As nc <br />KEEP THIS PLAN SE'l ON 611-E iei <br />,dLL TillAES <br />WMNIAN <br />(1,` <br />;y �� <br />11 wc( iJlh Street <br />COPE LAN D <br />New York, NY'1001[ <br />ASSOCIATES,P.C. ConauAiag Engineer,] <br />VALVED PRESSURE GAUGE <br />NEW CHILLER <br />ACC -3N <br />UNION <br />VIBRATION ELIMINATOR <br />TRANE CGA -120 <br />Drawing Title <br />SPA AC, AIRFLOW <br />& WATERFLOW <br />DIAGRAMS <br />Scale AS NOTdED <br />Date <br />Project No. 92090.04 <br />Drawing No. <br />it fklnTl nsmin r1A It 4 ruan r13 <br />