My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-008247 (sewer & water)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
4080 Bayside Road - 06-117-23-14-0014
>
Permits/Inspections
>
1996-008247 (sewer & water)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:23:41 PM
Creation date
1/19/2016 1:38:29 PM
Metadata
Fields
Template:
x Address Old
House Number
4080
Street Name
Bayside
Street Type
Road
Address
4080 Bayside Rd
Document Type
Permits/Inspections
PIN
0611723140014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> S�r .�E�STING, INC6 Steven B. Schirmers — MPCA Cert. No. 627 <br /> � 951 Katydid Lane E • St. Michael, MN 55376 • (612) 497-3566 <br /> Novembe 19 , 1994 <br /> Mark Harrington <br /> 4080 Bayside Rd. <br /> Orono , Henn. Co . , MN I <br /> This site has an existing Pressurized Mo nd System for a 3BR home . <br /> The system will be increased for a SBR h me . <br /> The mound will be added to at each end o the rock bed . The <br /> existing mound will need the topsoil rem ved to the washed sand <br /> with a backhoe with no travel on the mou d. The tank capacity <br /> will require an additional 1000 gallon h lding tank. The pumping <br /> chamber is a 1000 gallon capacity which eets City code for minimum <br /> capacity. Recommend to reshape and dive t the run off away f�om <br /> the pumping chamber . <br /> The future expansion is on 7o to 90 slope & will need approval <br /> by the City Official . <br /> The soi7..� at a depth of 12" have a perc lation rate averaging <br /> 2 . 9 min/inch. <br /> Al1 neighboring wells are located great r than 100 ' away from the <br /> proposed treatment area. <br /> Keep all heavy equipment off of the pro osed treatment area before <br /> and after construction. The treatment rea should be marked off <br /> before construction. This Design is no valid & the system will <br /> need to be relocated if failure to prot ct the areas proposed <br /> for On-Site Sewage Treatment occurs. <br /> With proper installation and maintenanc , this system should have <br /> no problem in treating septic effluent ffectively. <br /> Nothing other than gray water (laundry, showers , etc . ) human waste <br /> & toilet tissue should be disposed into the septic tanks . Garbage <br /> disposals are not recommended. Excessi e amounts of soaps , cleaning <br /> agents & chlorine agents may kill the b cteria needed to treat <br /> septic effluent. Additives are not rec mmended . Recommend to pump <br /> & clean your tank through the manhole b a certified pumper every <br /> year if you have 1 tank and every 2 yea s if you have two tanks . <br /> ; /�_ � . <br /> f <br /> even B. Schirmers <br /> SBS/ds <br />
The URL can be used to link to this page
Your browser does not support the video tag.