Laserfiche WebLink
UNIVERSITY <br /> oF MirrNEsoTA OSTP Field Evaluation Form '�o.� <br /> ,�..���� <br /> 1.Contact Information ro� ��� 09.22 <br /> Property Owner/Client Curtis&Liz LeVang Client Phone Number: <br /> Address Same <br /> Date Oct 25th,2011 Weather Conditions Sunny <br /> 2. Utility and Structure Information <br /> Utility Locations Identified ❑Gopher State One CaU# � ❑Any Private Utilities <br /> Property lines ❑De[ermined and Approved By Client Clients Approval(initial) <br /> ❑Determfied But Not Approved <br /> 0 Approximate <br /> ❑Property Lines Surveyed <br /> Locate and Verify(see Site Evaluation map) <br /> ❑� Existing Buildings ❑� Improvements ❑� Easements 0 Setbadcs <br /> 3. Site Information <br /> Percent Slope 8-Jan Slope Direction Hr�t <br /> Landscape Position Shoulder Slope Shape Linear <br /> Vegetation type(s) lawn and trees <br /> Evidence of cut,fill,compaded or disturbed areas ❑Yes ❑� No ❑Locate Areas on Site Evaluation Map <br /> Dixuss the flooding or run-on potential of site Build saddle upslope of Mound to divert rain and snowmelt. <br /> Identify benchmarks and elevations(Site Evaluotion Map)Top of Well Head @ 100.00' <br /> Proposed soil treatment area adequatety protxted �Yes ❑►'b <br /> 4. General Soils Information <br /> Original soits �Yes ❑No <br /> Type of observation ❑Soil Probe �Soil Boring ❑Soil Pit <br /> Number of soil observations �6 <br /> Soil observations were conducted in the proposed system location m Y� ❑� <br /> A soil observation was made within the most limiting area of the proposed system �Y� ❑� <br /> Soil boring log forms completed and attached 0 Y� ❑� <br /> Percolation tests performed,forms completed and attached �Yes ❑No <br /> 5. Phase I.Reporting Information <br /> Depth to standing water inches Anticipated construction issues <br /> Flood elevation feet <br /> Depth to bedrock inches <br /> Depth to periodically saturated soil 20 �- inches <br /> Maximum depth of system 0 inches <br /> Elevation at system bottom 93.08 feet Differences between wil survey and field evaluation <br /> Percolation rate 19 min/inch <br /> Loading rate 0.45 gpd/ft� <br /> Contourloading rate 12 gpd/ft <br /> Site evaluation issues/comments <br /> Limited area due to welt location and Kilkenny Soils that have restrictive percolation. Mound is�ptit into two parts <br /> of equal size but at different elevations. Install gate valve and squirt height tester on lower Mound unit to <br /> balance flows. Install just squirt height tester on higher unit as the reference squirt height and match lower one. <br /> i hereby certify that I have completed this work in accordance with all applic le ordi c rules and ws. <br /> Josh Swedlund � � Oct 25th,2011 <br /> (Designer) (Signa ure) (License#) (Date) <br />