Laserfiche WebLink
MA��CK°° Maverick Construction Company <br /> 11227 River Road N.E.Hanover Mn. 55341 <br /> Office 763-498-7401 Fax 763-498-7609 <br /> Lic#5572 <br /> LEVANG <br /> Main Level <br /> ,-,.�.� <br /> �• Family Room Height: S' <br /> 869.33 SF Walls 671.33 SF Ceiling <br /> _ 1,540.67 SF Walls&Ceiling 671.33 SF Floor <br /> �� � 74.59 SY Flooring 108.67 LF Floor Perimeter <br /> 108.67 LF Ceil.Perimeter <br /> DESCRIPTION QNTY REMOVE REPLACE TOTAL <br /> 1. R&R 5/8"drywall-hung,taped,floated, 221.54 SF 0.37 1.39 38991 <br /> ready for paint <br /> 2. R&R Batt insulation- 10" -R30 221.54 SF 0.33 1.16 330.10 <br /> 3. R&R Polyethylene vapor barrier 221.54 SF 0.08 0.22 66.46 <br /> 4. Detach&Reset Recessed light fixture 4.00 EA 0.00 0.00 425.28 <br /> 5. R&R Acoustic ceiling(popcorn)texture- 671.33 SF 0.40 1.00 939.86 <br /> heavy <br /> 6. Mask and prep for paint-plastic,paper, 108.67 LF 0.00 0.81 88.02 <br /> tape(per LF) <br /> 7. R&R Casing-2 1/4" hardwood 90.00 LF 0.44 2.91 301.50 <br /> 8. Stain&finish casing 90.00 LF 0.00 0.93 83.70 <br /> 9. Stain&finish door/window trim&jamb 6.00 EA 0.00 24.54 147.24 <br /> (per side) <br /> 10. Scaffold-per section(per week) 3.00 WK 0.00 48.00 144.00 <br /> 11. Scaffolding Setup&Take down-per 8.00 HR 0.00 39.22 313.76 <br /> hour <br /> 12. R&R Ceiling fan without light 1.00 EA 16.58 203.40 219.98 <br /> 13. Clean and deodorize carpet 201.40 SF 0.00 0.31 62.43 <br /> 14. Content Manipulation charge-per hour 2.00 HR 0.00 39.22 78.44 <br /> Totals: Family Room 3,590.68 <br /> TotaL•Main Level 3,590.68 <br /> Line Item Subtotals: LEVANG 3,590.68 <br /> Adjustments for Base Service Charges Adjustment <br /> Carpenter-Finish,Trim/Cabinet 12g•Zg <br /> Floor Cleaning Technician 69.44 <br /> LEVANG 2/12/2013 Page: 2 <br />