My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010300 (building)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
3850 Bayside Road - 05-117-23-23-0038
>
Permits/Inspections
>
1998-010300 (building)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:20:27 PM
Creation date
1/15/2016 2:16:00 PM
Metadata
Fields
Template:
x Address Old
House Number
3850
Street Name
Bayside
Street Type
Road
Address
3850 Bayside Rd
Document Type
Permits/Inspections
PIN
0511723230038
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Paul Madson and <br /> Associates, Ltd. <br /> • Project BABX-92-813 <br /> January 6, 1993 <br /> Page 7 <br /> the characteristics of the variations. The variations may result in additional foundation costs, <br /> and it is suggested that a contingency be provided for this purpose. <br /> To permit correlation of the soil data obtained to date with the actual soil conditions <br /> encountered during construction and to provide continuing professional responsibility for the <br /> conformance of the construction to the concepts originally contemplated in this report and to the <br /> plans and specifications, it is recommended that we be retained to develop and perform the <br /> recommended observation and testing program for the excavation and foundation phases of the <br /> project. <br /> If others perform the recommended observations and/or testing of construction, professional <br /> responsibility becomes dividetl since, in doing so, they assume responsibility for evaluating that <br /> the soil conditions throughout the construction areas are similar to those encountered in the <br /> borings or recognizing variations which require a change in recommendations. <br /> F.2 Review of Design <br /> This report is based on the preliminary design of the proposed structure as submitted to us for <br /> the preparation of this report. Because of the limited amount of information available, a number <br /> of assumptions were necessary to permit us to make recommendations. It is recommended that <br /> we be retained to review the final design and specifications to determine whether those <br /> assumptions were correct and whether any change in concept may have had an effect on the <br /> validity of our recommendations, and whether our recommendations have been implemented in <br /> the design and specifications. If we are not permitted an opportunity to make this recommended <br /> review, we will not be liable for losses arising out of incorrect assumptions, design changes, or , <br /> misinterpretation or misapplication of our recommendations. <br /> F.3 Groundwater Fluctuations <br /> Water level readings have been made in the borings at the times and under the conditions stated <br /> on the boring logs. These data have been reviewed and interpretations made in the text of this <br /> report. However, it must be noted that the period of observation was relatively short and that <br /> fluctuations in the groundwater level may occur due to rainfall, flooding, irrigation, spring <br /> thaw, drainage, seasonal and annual variations and other factors not evident at the time <br />
The URL can be used to link to this page
Your browser does not support the video tag.