Laserfiche WebLink
EXTERIOR ENVELOPE ENERGY CODE COMPUTATION WORKSHEET <br /> To Determine Compliance with the Minnesota Energy Code <br /> (Section 502 of the State Amended 1983 Model Energy Code) <br /> Project Tide <br /> � ,��, <br /> Site Address .��'-17 � /.3<�-Ss ���'_ f�-- <br /> I. EYPOSED WALL CALCULATIONS <br /> AREA "U" VALUE AREA x "U" <br /> A. Opaque Wall <br /> 1. Masonry/Concrete <br /> a. /3C� ��o s.-� 3 � x ��s'`� = 7• �- <br /> b. . x = <br /> c. x = <br /> 2. Foundatio Wall (Above Grade) <br /> a. l�� G� x = <br /> b. x = <br /> 3. Wood Frame Wall <br /> a. Insulated Area o2 3o G x 'Q 35� _ �O • � <br /> b. Framing Area (Ave. 15% at 16" oc) 0 6 R •0 6 = <br /> c. Framing Area (Ave. 10% at 24" oc) x = <br /> 4. Peripheral Floor Edge/Rim Joist 3(0� x � 3 �•/,3 <br /> a. 3 C�� � _ <br /> b. � x = <br /> B. Glazing <br /> 1. Windows <br /> a. �1 7`� 1`''3�x '� = 3/9• 3 <br /> b. x = <br /> 2. Doors �14,s S /6.5"- /O�x _3 � = 3`�•6 _ <br /> C. Doors <br /> 1. Wood <br /> a. Solid X — <br /> b. With storm door R = <br /> 2. Metal/h 5 �['l �_ �_x ,�_ ' <br /> 3. Overhead x — <br /> 4. Other x — <br /> D. TOTAL WALL AREA, sq. ft. � <br /> E. TOTAL OF AREA x "U" �� � � <br /> II. ROOF/CEILING CALCULATIONS <br /> A. Roof/Ceiling Insulated Area o��x ' �'? = 3 - <br /> B. Roof/Ceilinj Framing (Ave. 15% at 16" oc) x = <br /> C. Roof/Ceiling Framing (Ave. 10% at 24" oc) a YT x�__ <br /> D. Skylight X — �-�-- <br /> E. TOTAL ROOF/CEILING AREA sq. ft. �� <br /> ��. � <br /> F. TOTAL OF AREA x °U" <br /> 15 <br />