My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00902 (demo)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Rd - (AKA: Co. Rd. 84)
>
3510 Bayside Rd - 05-117-23-13-0016
>
Permits/Inspections
>
2014-00902 (demo)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:16:39 PM
Creation date
1/15/2016 1:45:23 PM
Metadata
Fields
Template:
Address
House Number
3510
Street Name
Bayside
Street Type
Road
Address
3510 Bayside Rd
Document Type
Permits/Inspections
PIN
0511723130016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Submit a $2,500 escrow and an escrow agreement signed by the property owner. <br /> 5. Keep all structure(s) enciosed and/or secured until such time as demolition is complete. - <br /> 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific <br /> prior approval is obtained in writing for temporary use thereof. <br /> 7. Compietely remove foundation(s) from the ground. <br /> 8. Completely dispose of all demolition debris off site in accordance with all applicable PCA <br /> requirements. <br /> 9. Abandon water wells in accordance with State Health Department regulations. <br /> 10. Call for an inspection when all debris has been removed, before backfi�ling. <br /> 11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site <br /> shall be left clean and clear of all debris, with any excavation filled with earth level with the <br /> adjacent ground elevation (except when such excavation is to be used as part of a new building <br /> and such new building is actually under construction). <br /> 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, <br /> crushed and filled with native soils. An inspection is required after the tanks are pumped and <br /> before the tanks are crushed and filled. <br /> 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, <br /> its agents, employees and assigns from and against all claims, damages, losses or expenses, <br /> including attorney fees, against the City, its agents, employees and assigns arising out of or <br /> resulting from the demolition described herein as performed by the property owner, his <br /> employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> ❑ $75.00 — Principal Structure $ <br /> � $50.00 —Accessory Structure x (how many) � <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge 5.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ �J . �� <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do <br /> all the work in a strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are complete, true and correct. <br /> Applicant's Signature: Date: ���s/� y <br /> Owner's Signature: Date: ���� /�� <br /> Approved By: Date: <br /> (Building Official) <br /> *Zoning Disclosure Required? ❑ YES ❑ NO <br /> *This must be filled out by Zoning Department— For either answer, a Zoning Official must sign all applications. <br /> * Approved By: Date: <br /> (Zoning Official) <br />
The URL can be used to link to this page
Your browser does not support the video tag.