My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00733 (New structure)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
3382 Bayside Road - 05-117-23-14-0069
>
Permits/Inspections
>
2010-00733 (New structure)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:19:03 PM
Creation date
1/15/2016 1:27:34 PM
Metadata
Fields
Template:
x Address Old
House Number
3382
Street Name
Bayside
Street Type
Road
Address
3382 Bayside Rd
Document Type
Permits/Inspections
PIN
0511723140069
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Number: 10.xxxxx <br /> Date: xx-xx-xx <br /> J Sheets: 2 of 2 <br /> 5201 East River Rd <br /> Suite 308 <br /> Minneapolis,MN 55421 <br /> Tel 763-571-2500 <br /> Faz 763-571-1168 <br /> www.ultelg.com <br /> SCOPE <br /> SCOPE INCLUDES DESIGN AND DETAILING OF A BOULDER RETAINING WALL WITH MAXIMUM EXPOSED HEIGHTS <br /> OF x'-x". ALL CONSTRUCTION IS TO BE DONE IN ACCORDANCE WITH STANDARD INDUSTRY PRACTICE AND THE <br /> REQUIREMENTS OF THE CODE. <br /> NOTES <br /> 1. THE FOOTING BOULDERS ARE TO BE BURIED INTO VIRGIN MATERIAL OR ENGINEERED FILL AS SHOWN IN <br /> THE WALL SECTIONS ALONG THE ENTIRE LENGTH OF THE WALL. <br /> 2. GRADE AT BASE OF WALL SHALL BE RELATIVELY LEVEL(2% MAX. GRADE). <br /> 3. INSTALL SMALL ROCKS BETWEEN LARGER BOULDERS TO PROVIDE A SOLID WALL AND TO PROVIDE <br /> SUPPORT FOR THE DRAINAGE MEDIUM. <br /> 4. DEPENDING ON THE DRAINAGE MEDIUM AND ON-SITE MATERIAL, THE CONTRACTOR MAY INSTALL FILTER <br /> FABRIC BEHIND THE DRAINAGE MEDIUM IN FRONT OF THE BACKFILL TO ENSURE THAT THE BACKFILL <br /> MATERIAL DOES NOT WORK OUT INTO THE DRAINAGE MEDIUM (OPTIMAL FOR A GRAVEL DRAINAGE MEDIUM) <br /> OR BETWEEN THE BOULDERS AND DRAINAGE MEDIUM (OPTIMAL FOR A SAND DRAINAGE MEDIUM). <br /> 5. THE DRAINAGE MEDIUM IS TO BE COMPACTED OVER THE FULL HEIGHT OF THE WALL AND CAPPED WITH A <br /> 6"THICK CLAY LAYER. PROPER COMPACTION PROVIDES FOR SOLID PACKED MATERIAL, WHICH TENDS NOT <br /> TO SHIFT BEHIND THE WALL. <br /> 6. INSTALL DRAINTILE AT THE BASE OF THE WALL. DRAINTILE IS TO DRAIN TO DAYLIGHT AT EACH END OF THE <br /> WALL AND INTERMEDIATELY USING WEEPS SPACED AT NO GREATER THAN SIX FEET ON CENTER OR AS <br /> REQUIRED. DRAINTILE AND DRAINAGE ARE ESSENTIAL TO KEEP THE FLUID PRESSURE REDUCED BEHIND <br /> THE WALL. <br /> 7. WALL LAYOUT, PROPERTY BOUNDARIES, GRADING, EXCAVATION, AND DRAINAGE IS BY OTHERS. <br /> 8. FINISHED GRADE BEHIND TOP OF WALL SHALL BE LESS THAN 10% MAX. SLOPE. <br /> MATERIALS <br /> BACKFILL: CLAY ON-SITE (EQUIVALENT FRICTION ANGLE =xx°) <br /> DRAINAGE MEDIUM: 100%SAND OR GRAVEL MATERIAL(NO FINES) <br />
The URL can be used to link to this page
Your browser does not support the video tag.