My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01041 - single family house
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Permits/Inspections
>
2013-01041 - single family house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:18 PM
Creation date
1/15/2016 12:58:23 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Permits/Inspections
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_r� <br /> r �OA TO <br /> 1�/ <br /> ITY OF ORONO <br /> ,� � Street Address: Mailing Address: Telephone(952)249-4600 <br /> y�, � 2750 Kelley Par ay P.O. Box 66 Fax (952)249-4616 <br /> �,q F,�' Orono, MN 553 6 Crystal Bay, MN 55323 www.ci.orono.mn.us <br /> KFs H o� <br /> October 11, 2013 <br /> Gonyea Homes <br /> Attn: Ethan <br /> 6102 Olson Memorial Highway <br /> Golden Valley, MN 55422 <br /> Re: Building Permit Application#2013-01041 <br /> 75 Bayside Trail <br /> On October 2, 2013 the City received a building permit appli ation for 75 Bayside Trail. Your application is <br /> incomplete. The following items must be submitted or revised in order for your application to be considered <br /> complete and for the plan review to continue: <br /> 1. Certificate of Survey. The City Engineer has reviewe the survey submitted and has the following <br /> comments: <br /> a. Survey should show the location of the propose erosion control measures. <br /> b. The driveway should have a culvert or other echanism under it to allow for drainage in the <br /> ditch by Bayside Trail. This culvert should be hown on the survey including invert elevations <br /> and size. It must be sized to accommodate at le st a 10 year storm event. <br /> c. Top of wall (TW) and bottom of wall (BW) ele ations must be called out on the survey for all <br /> retaining walls. <br /> 2. Building Plans. Page 6 of the building plans does not a pear to be drawn to scale. Please provide two <br /> scalable copies of page 6 to incorporate into the set of p ans we currently have for our review. <br /> 3. Building Height. Using the current highest window sho n (false window?), the house calculation is over <br /> the allowed defined height of 30 feet. The height ca culation works using the upper level bedroom <br /> windows. Please modify the plans accordingly or call to iscuss. <br /> 4. Escrow & Escrow Agreement. Permits involving gradi g and/or review by the City's engineer require <br /> submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee <br /> reimbursement to the City for out-of-pocket costs incur ed during the review of your plans. Additionally <br /> this escrow will guarantee conformance with City Co e Chapter 79 relating to erosion control and <br /> stormwater. The required escrow amount for this proje t is $2,500. The escrow agreement is enclosed. <br /> The property owner must sign the escrow agreement an submit a check for$2,500. <br /> Your project may trigger the Minnehaha Creek Watershed Dis rict's (MCWD) permitting requirements; please <br /> contact the MCWD regarding your project. Please note, the City of Orono will not issue a building permit <br /> without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not <br /> trigger any of their permitting requirements. The above inform tion is required in order for the plan review to <br /> continue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.