My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00827 - septic mound system
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Septic
>
2014-00827 - septic mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:18 PM
Creation date
1/15/2016 12:55:23 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Septic
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3• ABSORPTION AREA SIZING <br /> Note:Mound setbocks ore measured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.6)X Mound Abwrption Ratio 1.F)=Absorption Width <br /> 10.0 ft X 2 0 = 20.0 ft <br /> B. For slopes>1%,the Absorption Width is measured downhilt from the upsl pe edge of the Bed. <br /> Calcutate Downsfope Absorption Width:Absorption Width (3.A)-Bed Wi th (2.6)=ft <br /> 20.0 ft - 10 0 ft = 10.0 ft <br /> 4• MOUND SIZING <br /> A, Calculate C/ean Sand Lift: 3 feet minus Depth to Limiting Condition (1.0 =Clean Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.0 ft = 2.0 ft Design S nd Lift(optional): �Z� <br /> B. Calculate Upslope Height:Clean Sand Lift (4.A)+media depth (1 ft.)+c ver (t ft.)=Ups(ope Height <br /> 2.0 ft + 1.0 ft + 1.0 ft= 4, ft <br /> i,.J4:SIQG2 Mu![iUFi?r�ahl% <br /> ; land Slppe R 0 i 2 3 4 S 6 7 � 9 IO Il tt 13 I4 15 la I7 ;& 19 t0 11 tt 23 14 25 ; <br /> � �pc�p�a �i:i :.Gi 2.91 '[.83 :?5 2.SE 2.Rij2.5!�LJ3 La"[ 1.i5�2.31 2.25 211 2.'?�i�'3�:.G5 2.t� 2,U3 2.IAi 1.91 1.9i t.ii 1.9' 1.89 1.?.' I.ei I <br /> 6plm Rdi��; id:l �.uN� 3.d5 i,'0 i.57 i,.15 3.33 3.23 3.t't 3A3 2 9d�2.8b 2.IE i.lp 2.62 2.55 2.dE ?dt 2.?5 2.29 1.23 2JS 2.t3 LC�& 1.Q> I.58 I.S� <br /> ' ldlidSlOR@�; 0 1 2 7 4 � 6 7 A 9 10 II 12 13 Id 1� 16 !7 IB 19 t0 21 22 23 24 25 � <br /> � (n�';;nSlr,pP I's:1 )iC �.Ci i.:'r i.35 i.ai :.9:�i.5b�i.2t'� 3.r5 �i.11 �{.24 d.:8 ;.5"5�.45�i.�-t a.55 iE? 61, E.63 ?.,� 1.�? 7.i� 8..!"[�S.9i 9..{b I�.i��l <br /> i f��ll"ii(ii!'6 la:l 1.0�3 �.?7.1.35 d.5�1 3J6 S,CAI 5.ih 5.55 5.B8 6.�5 6.67 l.la 1.6y �.2i 8,92 �.�i 1Q2 16.51 11.67 12:�7 }3.14 '3.99 1.�.82�t5.67 !6.54 1�..E+� <br /> � Select Upslope Berm Mu(tiplier <br /> (based on land slope): 2.48 (figure D-34) <br /> D. Calculate Upsfope Berm Width:Multiplier (4.C)X Ups(ope Mound Meight 4.6)=Upslope Berm Width <br /> 2.48 ft X 4, ft = 10.0 ft <br /> E. Catculate Drop in E(evation Under Bed:Bed Width (2.6) X Land 5(ope (1.D : 100=Drop (ft) <br /> 10.0 ft X 7. % = 100= 0.70 ft <br /> F. Calculate Downslope Mound Height:Ups(ope Height (4.B)+Drop in E(evati n (4.E)=Downs(ope Height <br /> 4.0 ft + 0.7 ft = 4.7 ft <br /> � Select Downs(ope Berm Mu(tiplier <br /> (based on land slope): 5.32 (figure D-34) <br /> H. Calcu(ate Downslope Berm Width:Multip(ier (4.G)X Downs(ope Height (4. )=Downslope Serm Width <br /> 5.32 x 4.7 ft = 25.0 ft <br /> 1. Catculate Minimum Berm to Cover Absorption Area:Downslope Absorption idth (3.6 or 3.C)+4 ft. =ft <br /> 10.0 ft + 4 ft = 14.0 ft <br /> J. Design Downsfope Berm =greater of 4H and 41: 25. ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm (4.K)X Downslope Mound Height (4.F)=Endslope erm Width <br /> 3.00 fc X 4.7 ft = 14.0 ft <br /> M.Calculate Mound Width: Upslope Berm Width(4.D)+Bed Width (2.6)+Do lope Berm Width (4.J)=ft <br /> 10.0 ft + 10.0 f + 25.0 ft = 45.0 ft <br /> N. Calculate Nbund Length:Endslope Berm Width (4.L)+Bed Length (2.C)+E dslope Berm Width (4,L)=ft <br /> 14.0 ft + 63.0 f + 14.0 tt = 91.0 ft <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.