Laserfiche WebLink
2. The as-built survey lists the septic tanks as proposed. The survey does not depict any contour changes over the <br /> primary septic site. Please clarify. <br /> Please update the as-built survey and submit a full-size copy for our review. If you have any questions, please don't <br /> hesitate to contact me. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono MN 155356 (physical address) <br /> PO Box 66 1 Crystal Bay I MN 55323-0066 (mailing address) <br /> 9 952.249.4620 1 g 952.249.4616 <br /> ® cmattson@ci.orono.mn.us I -'I� www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 18 through Friday,September 4,2015) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday,September 7, 2015 <br /> 2 <br />