Laserfiche WebLink
November 26, 2013 <br /> 1513 Bay Ridge Road <br /> Page 3 of 3 <br /> This evaluation must also include a determination of whether the wetland alteration being <br /> proposed requires permits, reviews or approvals by other sections of city ordinances or by <br /> other local state or federal agencies including but not limited to watershed districts, state <br /> department of natural resources, or the United States Army Corps of Engineers. <br /> (2) Alterations must be designed and conducted in a manner that ensures only the smaliest <br /> amount of bare ground is exposed for the shortest time possible. <br /> (3) Mulches or similar materials must be used, where necessary, for temporary bare soil <br /> coverage, and a permanent vegetation cover must be established as soon as possible. <br /> (4) Methods to minimize soil erosion and to trap sediments before they reach any surface water <br /> feature must be used. <br /> (5) Altered areas must be stabilized to acceptable erosion control standards consistent with the <br /> field office technical guides of the local soil and water conservation districts and the United <br /> States Soil Conservation Service. <br /> (6) Fill or excavated material must not be placed in a manner that creates an unstable slope. <br /> (7) Plans to place fill or excavated material on steep slopes must be reviewed by the city engineer <br /> for continued slope stability and must not create finished slopes of 30 percent or greater. <br /> (8) Fill or excavated material must not be placed in bluff impact zones. <br /> (9) Any alterations below the ordinary high water level of public waters must first be authorized by <br /> the commissioner of the department of natural resources under Minn. Stat. § 103G.245. <br /> (10) Alterations of topography must only be allowed if they are accessory to permitted or <br /> conditional uses and do not adversely affect adjacent or nearby property. <br /> (11) Placement of natural rock riprap, including associated grading of the shoreline and placement <br /> of a filter blanket, is permitted if the finished slope does not exceed three feet horizontal to one <br /> foot vertical, the landward extent of the riprap is within ten feet of the ordinary high water level, <br /> and the height of the riprap above the ordinary high water level does not exceed three feet. A <br /> riprap permit shall be obtained per the requirements of section 78-969 <br /> (fl Excavations where the intended purpose is connection to a public water, such as boat slips, canals, <br /> lagoons and harbors, are prohibited above the ordinary high water level. Such excavations below <br /> the elevation or the ordinary high water level are subject to approval of the department of natural <br /> resources and other agencies with concurrent jurisdiction. <br /> (Ord. No. 101 2nd series, § 1(10.56(16)(J)), 2-24-1992; Ord. No. 127 2nd series, § 8, 7-11-1994; Ord. No. <br /> 163 2nd series, § 3, 12-8-1997; Ord. No. 171 2nd series, § 2, 4-4-1998; Ord. No. 28 3rd series, § 17, 8- <br /> 22-2005) <br />