My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00719 (land alteration)
Orono
>
Property Files
>
Street Address
>
B
>
Bay Ridge Road
>
1473 Bay Ridge Road - 10-117-23-34-0005
>
Permits/Inspections
>
2012-00719 (land alteration)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:26:43 PM
Creation date
1/15/2016 12:09:05 PM
Metadata
Fields
Template:
x Address Old
House Number
1473
Street Name
Bay Ridge
Street Type
Road
Address
1473 Bay Ridge Road
Document Type
Permits/Inspections
PIN
1011723340005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> Attention: Melanie Curtis <br /> Planning & Zoning Coordinator <br /> July 25, 2012 <br /> Re: New Paver Patio <br /> 1473 Bay Ridge Road <br /> Dear Melanie, <br /> Please find enclosed the Zoning Permit Application for our new on-grade concrete paver <br /> patio. The patio will be located over the west portion of where our swimming pool was <br /> located. We have shown this location on a survey that also shows where the pool was <br /> located and we have included a separate, more detailed drawing of the new patio. <br /> A new Hardcover Calculation Worksheet is enclosed showing existing and proposed <br /> hardcover in the 75-250 zone. The net effect of this new patio and the removal of the <br /> pool, pool apron and old deck will reduce hardcover in the 75-250' zone by 369 s.f., a <br /> 7.3% reduction in actual hardcover in the zone. We received a variance in 1995 to have <br /> 26.7% hardcover in this zone but we will now be under 25%, with most of the reduction <br /> being closest to the lake. This area closest to the lake will be returned to lawn. <br /> There will be no change whatsoever in drainage flow on our property or on adjacent <br /> property from this work. Drainage is shown on a drawing submitted with the pool <br /> demolition permit application. <br /> In your previous email, you didn't say if a Zoning Permit Escrow Agreement and escrow <br /> would be necessary for the patio. If so, can you simply hold the one associated with the <br /> pool demolition permit? The pool demolition and fill will take about a week and the patio <br /> construction will start immediately thereafter. <br /> We intent to start the pool demolition August 27 and the patio September 4. For obvious <br /> reasons, we want to complete the work, remove the silt fence, grade, and re-sod yet this <br /> fall. I am out of town the first two weeks of August so I wanted to get these permits <br /> before I leave . Thank you again for your cooperation and help. <br /> Sin�ely, <br /> "��ni�?'����-'�'-�e� <br /> Tom McCune <br /> 1473 Bay Ridge Road <br /> Home 952-473-3245 Cell 239-216-0028 <br />
The URL can be used to link to this page
Your browser does not support the video tag.