Laserfiche WebLink
� . <br /> 10135 47th AVE. PLYMOUTH, MN <br /> 612-810-9628 <br /> 763-550-2919 FAX � � �r <br /> � � �� � � 5� <br /> Memo ��� s <br /> �� � <br /> To: Building Department <br /> From: Rick Storlien <br /> Date: 2/18/2011 <br /> Re: Interior Remodel <br /> This memo is in regard to site review of framing to carry existing roof loads down to existing foundation. <br /> Master Bath & Closet area headers as noted on plans are adequate to carry ceiling framing and Gyp. Bd loads <br /> that will be installed. Single and double trimmer studs will transfer loads to existing floor system. <br /> Due to minimal loading on these walls existing framing should be fine. Post loads vary from 150# to 250#, <br /> Existing floor joists will carry these loads. Provide double cross blocking between joists where posts do not bear <br /> on joists. <br /> Kitchen/Family Room area framing as built as noted on plans is adequate to carry roof loads as noted on plans <br /> and transfer loads down to existing foundation thru posts as noted. <br /> Feel free to contact me if there are any questions. <br /> Rick Storlien <br /> 1 <br />