Laserfiche WebLink
r l� � <br /> Erosion Control Supplemental Information <br /> Final Stabilization will be provided with(seed,sod,etc): .,.�C� . <br /> and 6 inches of topsoil will be ad.ded/replaced prior to final stabilization. <br /> Concrete Washout:Location of concrete washout <br /> �Off site m Indicated on site plans _Other(description): ,�Contained on truck: <br /> Vegetation:Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is gre,a.ter,of all vegeta.tion to be retained. <br /> �Yes _Not Applicable Other(description): <br /> Inspections:An erosion control inspection plan is required for all projects disturbin.g'/4 acre or <br /> greater.The inspection requirements are as follows: <br /> 1) The individual tdent�4ed as beirag responrible for impdementtng the erosaon comrod <br /> plcrn must routinedy irrspect the co�structlon site once every seven days dduring active <br /> core�uction and within 24 hours after a rairif'ald eve�et g'reater than 0.5 inches dn 24 <br /> hours. <br /> Z) Add it�spectdons and ma�rtenance conducted during co�ctior�must be recorded in � <br /> writdng c�td these records must be retained w8th the erosion cor�trol pdara and rveade <br /> � available at the Distrzct's request wdthan 24 hours Records of each irrspection and <br /> matntenance actdvity shall tnclude: <br /> t Date c�d tdme of�spections; <br /> ii. Name ofperson conducting inspectdons; � <br /> ii� FBnc�irrgs of dnspecHons, including recommendations for corrective actiortis; <br /> iv. Corrective actiorrs taken(includirrg d�es,times and party completing <br /> naai�ttenance activities);and <br /> x Date and mnm�at of ald ruinfald events greater than 0.5 i�tches in 24 hours. <br /> Provida the following information for the primary individual responsible for implementing tha erosion <br /> conlrol plan: <br /> Name 1�'al.�lA.�j /�2L�'L����a� <br /> Organiza.tion <br /> Phone �o/Z.�� ��� Alternabe Phone �• 9�- ���� <br /> � i�/�.Cg�ic�. �3���'G��. �y <br /> - I certify that I am famili�r with the requirements of the MCWD Erosion Control Rale and that the <br /> proposed activ�lty will be condncted in compliance with tLis rale. <br /> �L��r�/�/� Z f1 i Z�/o$,� ` - <br /> Signature of Applicant or Authorized Agent Date <br /> . .l�l �� Z�15 <br />