My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00806 (Deck)
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1396 Baldur Park Road - 08-117-23-31-0002
>
Permits/Inspections
>
2013-00806 (Deck)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:43:08 PM
Creation date
1/14/2016 1:21:11 PM
Metadata
Fields
Template:
x Address Old
House Number
1396
Street Name
Baldur Park
Street Type
Road
Address
1396 Baldur Park Rd
Document Type
Permits/Inspections
PIN
0811723310002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PLAN REVIEW CHEC�CLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address/Permit Number: f 3�1 b �If�v1Q� ��- <br /> Description of work: ���GC... I(.�'�-�W-�-h 1 r� �t�� <br /> Septic review by: IV/(f� Date Approved: <br /> Zoning review by: hJ /� Date Approved: <br /> Building review by: Date Approved: `�- b � t� <br /> Grading review by: ��� Date Approved: <br /> Zon' g District: Zoning File#: Reso#: Reso Date: <br /> Zonin • Lot Area: SF/AC Width: Lot Coverage: %SF _% <br /> Survey S mitted: 0 Yes 0 No Date of Survey: Revised�ate(?): <br /> Proposed Set cks: <br /> Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour} <br /> Perimeter(linear feet) = 50% _ #of Stories Ok? 0 YES <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: <br /> The distance between t�ie lowest R A BUlLDING ON A SLAB FOUNDATION: <br /> START WITH proposed floor(of the basement or crawl <br /> space)and the highest poin�of the roof. START WITH The distance between the top of slab and <br /> If you have a.., the highest point of the roof. <br /> � If you have a... <br /> • GABLE OR HIPPED ROOF(no . GABLE OR HIPPED ROOF(no <br /> windows): Subtract half the windows): Subtract half the distance <br /> distance between the highest poi between the highest point of the roof <br /> of the roof to the low point of th to the low point of the corresponding <br /> SUBTRACTION corresponding gable or hippe roof SUBTRACTION gable or hipped roof <br /> (BASED ON ROOF . GABLE OR HIPPED ROO (with (BASED ON . GABLE OR HIPPED ROOF(with <br /> TYPE) windows): Subtract hal e ROOF TYPE) windows): Subtract half the distance <br /> distance between the op of the between the top of the highest <br /> highest window an he highest �` window and the highest point of the <br /> point of the roof �� � roof <br /> • ALL OTHER OOF TYPES(flat, ALL OTHER ROOF TYPES(flat, <br /> mansard, ):No subtraction. mansard,etc No subtraction. <br /> ADDITION Add the distance between the top of slab <br /> SUBTRACTION Subtract the ' tance between the (BASED ON and the highest existing grade adjacent to <br /> (BASED ON EXISTING basemenU wl space floor and the EXISTING the foundation. <br /> GRADES) highest isting grade adjacent to the GRADES <br /> found ion OR 1 o feet(whichever is less). EQUALS Defined building height <br /> EQUALS De ned building height <br /> Shoreland Distr' t MCWD Permit Received Avera e Lakeshore Setback Met? Bluff <br /> 0 Yes � No � N/A � Yes 0 No <br /> 0 Yes 0 No � Yes � No 0 N/A <br /> � <br /> / Permit Number: S back: <br /> Storm ater Quality Existing Proposed Variance Required CUP Required <br /> Over District Tier Hardcover Hardcover <br /> � Yes � No 0 Yes � No <br /> Type(s): Type(s): <br /> Updated: January 2013 ,/�`� / �.�.�'�/�j� <br /> v:\forms�plan review checklist 2013.docx /u �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.