My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-16-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
11-16-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 10:05:02 AM
Creation date
1/13/2016 10:04:27 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i � � <br /> . � � RECEI SA�:•IIf7�L� � <br /> f b <br /> REBECCA L. H�LZEM AUG� �°���cv�.� <br /> 3407 East Lake Street � <br /> Orono,MN 55356 Ci-N pF ORONO <br /> Phone: 612.8010.7140 �r��y. .,,,� <br /> �;'�� •���''''���J <br /> August 10, 2015 �� <br /> CITY �,F' �.;�..:;� <br /> Attentton: Mfc�ae� P.Gaffron <br /> City of Orono <br /> 2750 Keffey Perkway <br /> Orono� MN 55356 <br /> RE: Larai Use Application and Proposed Zonin,g Amendmertts -- #15�3769 -- 3409 East Lake Street <br /> Deer Mr.Gsffron. <br /> Following a detallec!r�eview of the property survejr and the proposed�arage plans on fi�e yvitt�the Gtity of Orona <br /> for the above referetxaed land use applicaUon and propoeed zoning amendments, !would like bo submtt the <br /> followtng comments for consideratlon. <br /> � The Survey on flte is dated lune 08,2009. Since that date,the fprmer owners of the property made <br /> multiple chat�es to the pr�op�erty thus making thls survey obsotete, Ctmn�es that were made indude <br /> but are not Ilmibed to the tollowing: <br /> o The roof,toge#her wlth tf�e wafis of tfie garage that is re�erenced fn the survey and which exfsted <br /> in 2009 has since been remaved. Wowever,the broken-up conc�+ete slab on whic�#he garege <br /> stood rvas left in place and wooden deddng Mas s�nce been eoc�tructed on the ma�ortty af the <br /> siab. <br /> o A new d�lveway was lttstatled which ts wider tha�both t?�e orlglnal drfveway and the drive <br /> proposed In the 2009 survey and plan. {See your flles for date permft was pullecl.) <br /> o A paved patlo area was installed alon�the e�at aide of the dedc to connect to tha new drtvewey. <br /> o P�grave�was dumped in a large area between the a!d�arage slab and the new drtveway. <br /> o The steps and pavers along the south slde of the deck were removed and replaced by <br /> conttnuous steps that run the er�ttre lengtt�of the deck. <br /> o In Ifeu ot lan�cape fabric, rubber membrane used to wst�proof tha basemeret of the house <br /> was placed around the perimeter of the house and oovered witfi decorative rock. <br /> a The same rubber membrane was also plaved over a signiftcant portlon of the front yard when <br /> #he lavm vras tumed into a flower garden. <br /> o Concrete landscaptng b)a�cs were ir�sialled to create a boar+der around the north and e� <br /> Perin'�et,ers of tihe property es well as other ar�s on the property to define pfanting beds. <br /> Page i of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.