My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
10-19-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:15:37 AM
Creation date
1/13/2016 9:15:10 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#15-3787 <br /> 14 October 2015 <br /> Page 5 of 5 <br /> the need for a storm shelter and additional storage on the property serve as a practical <br /> difficulty. <br /> The Commission may recommend or Council may impose conditions in granting of variances. <br /> Any conditions imposed must be directly related to and must bear a rough proportionality to the <br /> impact created by the variance. No variance shall be granted or changed beyond the use <br /> permitted in this chapter in the district where such land is located. <br /> Practical Difficulties Statement <br /> Applicant has completed the Practical Difficulties Documentation Form attached as Exhibit B, and <br /> should be asked for additional testimony regarding the application. <br /> Practical Difficulties Analysis <br /> Staff finds that the location of the sewer easement, the lack of a basement, and the existing <br /> structural level create practical difficulties for expanding the home or constructing a detached <br /> garage. Staff recommends the Commission consider the current request against the previous <br /> approvals, which are still in effect. The applicant does not wish to add on to the home as was <br /> previously contemplated. Limiting current approvals for an enlarged shed/garage to the total <br /> square footage permitted in 2014 may be an appropriate consideration. Staff suggests the <br /> Commission discuss the effects of the additional visible massing resulting from the 4-foot <br /> cantilever with 2%foot roof overhangs and make a recommendation accordingly. <br /> Public Comments <br /> Staff has not received any comments from the public regarding the applicant's project. <br /> Issues for Consideration <br /> 1. Does the Planning Commission find that that the property owner proposes to use the <br /> property in a reasonable manner which is not permitted by an official control? <br /> 2. Does the Planning Commission find that the variance(s), if granted, will not alter the <br /> essential character of the neighborhood? <br /> 3. Does the Commission find it necessary to impose conditions in order to mitigate the <br /> impacts created by the granting of the requested variance(s)? <br /> 4. Are there any other issues or concerns with this application? <br />
The URL can be used to link to this page
Your browser does not support the video tag.