My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-21-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
09-21-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:25 PM
Creation date
1/13/2016 8:59:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(7) Plans to place fill or excavated materral on steep slopes must be reviewed by the city engineer <br /> for continued slope stability and must not create finished slopes of 30 percent or greater. <br /> (8) Fill or exca�ated material must not be placed in bluff impact zones. <br /> (9} Any alterations below the o�dinary high water level of public waters must first be authorized by <br /> the commissioner of the dep�rtment of natural resources under Minn. Stat. § 103G.245. <br /> (90) Alterations of tnpography must only be allowed if they are aooessory to permitted or concfitional <br /> uses and do nat adversely affect adjacent or nearby property. <br /> {11) Placement of natural rock riprap, including associated grading of the shoreline and placement of <br /> a filter bfanket, is permitted if the finished slope does nat exceed three feet horizontal to one foot <br /> veracal, the landward extent of the riprap is within ten feet of the ordinary high water level, and <br /> the height of the riprap above the ordinary high waber level does not exceed three feet. A riprap <br /> permit shall be obtained per the requirements of section 78-969. <br /> (f� Exca�ations where the intended purpose is connection to a public water, such as boat slips, canals, <br /> lagoons and harbars, are prohibited above the ordinary high water level. Such excavations befow the <br /> e[evation orthe ordinary high water level are subject to approval of the department of natural resources <br /> and other agencies with concurrent jurisdiction. <br /> (Ord.No. 101 2nd series, § 1(10.56(16)(�}, 2-24-1992; Ord. Na. 127 2nd series, § 8, 7-11-1994; <br /> Ord.No. 163 2nd series, § 3, 12-8-1997; Ord.No. 171 2nd series, § 2, 4�-1998; Ord.No. 28 3rd <br /> series, § 17, 8-22-2005; Ord.No. 133 3rd series, §§ 2, 3, 1-26-2015) <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.